Skip to main content

Rail industry, regulators debate feasibility of PTC

US rail industry officials and federal accident regulators have disagreed about the viability of a looming mandate that most US railways be equipped with automated control systems by the end of next year. Congress is requiring that most major railroad companies install automated systems known as positive train control (PTC) by December 2015. Automated train systems have gained renewed attention after a spate of high-profile accidents on passenger and freight railways, including most recently a Decem
March 10, 2014 Read time: 3 mins

US rail industry officials and federal accident regulators have disagreed about the viability of a looming mandate that most US railways be equipped with automated control systems by the end of next year.

Congress is requiring that most major railroad companies install automated systems known as positive train control (PTC) by December 2015.

Automated train systems have gained renewed attention after a spate of high-profile accidents on passenger and freight railways, including most recently a December derailment of a freight train in North Dakota that resulted in 400,000 gallons of crude oil being spilled.

The law requiring the implementation of automated train control systems by 2015 has been on the books since 2008.

However, Association of American Railroads President Ed Hemberger told members of the Senate Commerce, Science and Transportation Committee that the automated systems have proven to be more difficult to install than regulators imagined.

"PTC is an unprecedented challenge, both in terms of the technologies to be used and the integration of those technologies," Hemberger told the panel in testimony submitted before Thursday's hearing.

"The railroad industry began working several years ago with the 2115 Federal Communications Commission (FCC) to licence the wireless spectrum necessary for PTC,” he said.  However, under the FCC’s interpretation of Section 106 of the National Historic Preservation Act (NHPA), railroads must ascertain, on an antenna-by-antenna basis, if the antennas will negatively impact areas of historic, cultural, or religious significance.

Hemberger said the railroads were in agreement with federal regulators about the importance of installing automated train control systems to boost safety.  But the rail association chief said the only solution to the challenges facing the train industry was to push back the 2015 deadline for them to automate.

"The bottom line is that without further changes to the FCC approval process, the timeline for ultimate deployment of PTC will be delayed significantly," Hemberger said.

5628 National Transportation Safety Board (NTSB) Vice Chairman Chris Hart said the safety benefits of automating trains should outweigh the rail industry's technical concerns.

"Implementation of PTC systems was included on the NTSB’s Most Wanted List when the list was First published in 1990 and has remained on the list almost continuously since that time," Hart said. "We may never eliminate human error from the railroad system, but PTC provides a level of redundancy to protect trains and those on board when human factors, such as distraction or fatigue, might otherwise set an accident sequence into motion." 

For more information on companies in this article

Related Content

  • ITS America applauds V2I infrastructure Act
    June 5, 2015
    Regina Hopper, president and CEO of ITS America, has responded to the introduction of the Vehicle-to-Infrastructure Safety Technology Investment Flexibility Act of 2015 by US Senators Gary Peters and Roy Blunt. The Vehicle-to-Infrastructure Safety Technology Investment Flexibility Act of 2015 authorizes states to use existing surface and highway transportation funding provided by the National Highway Performance Program, the Surface Transportation Program and the Highway Safety Improvement Program to in
  • Island Radar: safely crossing continents
    August 6, 2020
    There is a safety flashpoint wherever roads cross over railways. Island Radar is using well-established traffic technology to keep all parties safe from harm.
  • Reducing incident clear up times, saving money
    January 24, 2012
    In 2007 in Atlanta, Georgia, it took over four hours to open the road after a major commercial vehicle incident. Not any more. Four years ago the Texas Transportation Institute (TTI) cited Atlanta, Georgia as the third-most congested city in the United States. Each traveller in metro Atlanta lost an incredible 57 hours a year to traffic delays, wasting 40 gallons of fuel while sitting in traffic. In 2007, it took nearly four and a half hours to open travel lanes after an average tractor-trailer incident. Th
  • Cambodia's first commercial train begins operation
    January 2, 2013
    After years of renovation, Cambodia's modern railway system has commenced commercial rail operations on the 256 km southern line between the capital city of Phnom Penh and Sihanoukville Port. The renovation was carried out with financial support from the Asian Development Bank (ADB) and development partners. "ADB welcomes this first commercial train service to the Port of Sihanoukville which marks a significant development towards the completion of the long-awaited Pan-Asian railroad - a contiguous Iron Sil