Skip to main content

Rail industry, regulators debate feasibility of PTC

US rail industry officials and federal accident regulators have disagreed about the viability of a looming mandate that most US railways be equipped with automated control systems by the end of next year. Congress is requiring that most major railroad companies install automated systems known as positive train control (PTC) by December 2015. Automated train systems have gained renewed attention after a spate of high-profile accidents on passenger and freight railways, including most recently a Decem
March 10, 2014 Read time: 3 mins

US rail industry officials and federal accident regulators have disagreed about the viability of a looming mandate that most US railways be equipped with automated control systems by the end of next year.

Congress is requiring that most major railroad companies install automated systems known as positive train control (PTC) by December 2015.

Automated train systems have gained renewed attention after a spate of high-profile accidents on passenger and freight railways, including most recently a December derailment of a freight train in North Dakota that resulted in 400,000 gallons of crude oil being spilled.

The law requiring the implementation of automated train control systems by 2015 has been on the books since 2008.

However, Association of American Railroads President Ed Hemberger told members of the Senate Commerce, Science and Transportation Committee that the automated systems have proven to be more difficult to install than regulators imagined.

"PTC is an unprecedented challenge, both in terms of the technologies to be used and the integration of those technologies," Hemberger told the panel in testimony submitted before Thursday's hearing.

"The railroad industry began working several years ago with the 2115 Federal Communications Commission (FCC) to licence the wireless spectrum necessary for PTC,” he said.  However, under the FCC’s interpretation of Section 106 of the National Historic Preservation Act (NHPA), railroads must ascertain, on an antenna-by-antenna basis, if the antennas will negatively impact areas of historic, cultural, or religious significance.

Hemberger said the railroads were in agreement with federal regulators about the importance of installing automated train control systems to boost safety.  But the rail association chief said the only solution to the challenges facing the train industry was to push back the 2015 deadline for them to automate.

"The bottom line is that without further changes to the FCC approval process, the timeline for ultimate deployment of PTC will be delayed significantly," Hemberger said.

5628 National Transportation Safety Board (NTSB) Vice Chairman Chris Hart said the safety benefits of automating trains should outweigh the rail industry's technical concerns.

"Implementation of PTC systems was included on the NTSB’s Most Wanted List when the list was First published in 1990 and has remained on the list almost continuously since that time," Hart said. "We may never eliminate human error from the railroad system, but PTC provides a level of redundancy to protect trains and those on board when human factors, such as distraction or fatigue, might otherwise set an accident sequence into motion." 

For more information on companies in this article

Related Content

  • Georgia DoT showcases its connectivity
    March 3, 2020
    Georgia DoT’s regional connected vehicle programme could be a model for the rest of the US. Adam Hill speaks to two men involved in making it a reality – and takes a look at the state’s first-ever Tech Showcase
  • High level support for US DOT decision on vehicle to vehicle technology
    February 4, 2014
    The US Department of Transportation's (DOT) National Highway Traffic Safety Administration (NHTSA) is to begin taking steps to enable vehicle-to-vehicle (V2V) communication technology for light vehicles. This technology would improve safety by allowing vehicles to communicate with each other and ultimately avoid many crashes altogether by exchanging basic safety data, such as speed and position, ten times per second. DOT research indicates that safety applications using V2V technology can address a large
  • Wabtec to supply components for new transit cars in Denver
    July 3, 2012
    Wabtec Corporation has signed contracts worth about US$25 million to provide components, including on-board positive train control (PTC) equipment, for 50 new transit cars being built by Hyundai-Rotem. The cars will be used on new commuter rail lines being built by Denver Transit Partners in Colorado. Several Wabtec units will provide the equipment for the cars: Wabtec Passenger Transit (brakes and couplers), Wabtec Railway Electronics (PTC equipment), Bach-Simpson (event recorders) and Vapor Stone (doors)
  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.