Skip to main content

Qatar awards first phase of New Orbital Highway

Qatar’s Public Works Authority (Ashghal) has awarded include the contract for the design and construction of the first 45 kilometre phase of the ambitious 180k kilometre New Orbital Highway.
January 13, 2014 Read time: 1 min
Qatar’s Public Works Authority (5840 Ashghal) has awarded include the contract for the design and construction of the First 45 kilometre phase of the ambitious 180k kilometre New Orbital Highway.

The contract, worth about US$900 million, represents around 25 per cent of the highway and has been awarded to a joint-venture between J&P Overseas and J&P Avax.

Ashghal has also awarded other infrastructure contracts on the Al Rayyan road, worth around US$1.2 billion, for road and expressway construction including improved pedestrian footpaths and cycleways, service roads, grade separated interchanges and secondary intersections.

For more information on companies in this article

Related Content

  • Norway gets ready for more EVs
    September 14, 2021
    Norway’s road transport network is changing radically. The country is gearing up for greater electric vehicle use as well as gradually phasing out its traditional ferry links
  • AGD Systems partners with Traffic Tech Group on pedestrian detection
    March 12, 2015
    AGD Systems has a strategic new partnership with Qatar-based Traffic Tech Group to introduce its award-winning pedestrian detection solutions in the Middle East. Traffic Tech Group will be AGD’s exclusive global distributor for Puffin and Toucan pedestrian crossings in the region to increase pedestrian and cyclist safety and improve traffic flows. On-street trials of AGD-enabled Puffin and Toucan schemes commenced in November 2014 at a dual pedestrian crossing on the busy Al-Jazeera Al-Arabiya Road in Doha,
  • Saudi Intermobility Expo 2024 brings transport to fore
    November 4, 2024
    Event runs 11-13 November at the Jeddah International Exhibition & Convention Center
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was