Skip to main content

Qatar awards first phase of New Orbital Highway

Qatar’s Public Works Authority (Ashghal) has awarded include the contract for the design and construction of the first 45 kilometre phase of the ambitious 180k kilometre New Orbital Highway.
January 13, 2014 Read time: 1 min
Qatar’s Public Works Authority (5840 Ashghal) has awarded include the contract for the design and construction of the First 45 kilometre phase of the ambitious 180k kilometre New Orbital Highway.

The contract, worth about US$900 million, represents around 25 per cent of the highway and has been awarded to a joint-venture between J&P Overseas and J&P Avax.

Ashghal has also awarded other infrastructure contracts on the Al Rayyan road, worth around US$1.2 billion, for road and expressway construction including improved pedestrian footpaths and cycleways, service roads, grade separated interchanges and secondary intersections.

Related Content

  • April 30, 2015
    The UK’s busiest crossing adopts free flow charging
    Colin Sowman looks at the transition to free-flow charging on the Dartford Crossing, a notorious congestion blackspot on the UK motorway network. The Dartford Crossing, where London’s orbital M25 motorway crosses the lower reaches of the River Thames 32km (20 miles) to the east of Central London, has long been a major source of congestion. Now, to alleviate the congestion caused by some 50 million crossings per year, the Highways Agency has adopted a free-flow charging system - but the Crossing’s location a
  • May 16, 2018
    ACE report: private sector and user-pay for English roads
    It’s one minute to midnight for funding England’s roads, according to a timely new report - and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas. Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently-published report Funding Roads for the Future. The 25-page document by the London-based Association for Consultancy and Engineering (ACE) calls for a radical rethink about how to
  • March 28, 2022
    Lidar: recipes for success
    Lidar is being deployed all over the world - and you can even read a cookbook on the subject...
  • November 4, 2015
    Indra to upgrade Philippines toll system
    Manila North Tollways Corporation (MNTC) has awarded Indra the design, supply, installation, and commissioning of the new toll control solution for its Subic-Clark-Tarlac Expressway (SCTEX) concession. The project includes the integration of the SCTEX toll control solution with that of the system that Indra recently implemented for the North Luzon Expressway (NLEX), the main motorway connecting the capital region of Metro Manila to the northern regions of the country. The contract, awarded in a consortium w