Skip to main content

Qatar awards first phase of New Orbital Highway

Qatar’s Public Works Authority (Ashghal) has awarded include the contract for the design and construction of the first 45 kilometre phase of the ambitious 180k kilometre New Orbital Highway.
January 13, 2014 Read time: 1 min
Qatar’s Public Works Authority (5840 Ashghal) has awarded include the contract for the design and construction of the First 45 kilometre phase of the ambitious 180k kilometre New Orbital Highway.

The contract, worth about US$900 million, represents around 25 per cent of the highway and has been awarded to a joint-venture between J&P Overseas and J&P Avax.

Ashghal has also awarded other infrastructure contracts on the Al Rayyan road, worth around US$1.2 billion, for road and expressway construction including improved pedestrian footpaths and cycleways, service roads, grade separated interchanges and secondary intersections.

For more information on companies in this article

Related Content

  • Dutch survey shows drivers are in favour of road user charging
    January 16, 2012
    'Keep it simple, stupid' is an oft-forgotten axiom but in terms of road user charging it is entirely appropriate. So says the ANWB's Ferry Smith. A couple of decades ago, it might have been largely true that the technology aspects of advanced road infrastructure were the main obstacles to deployment. However, 20 years or more of development have led to a situation where such 'obstacles' are often no more than a political fig-leaf. Area-wide Road User Charging (RUC) is a case in point; speak candidly to syst
  • FDOT partners with Florida Poly to develop transportation test facility
    September 29, 2016
    The Florida Department of Transportation (FDOT) and Florida Polytechnic University are to partner in a new transportation technology testing facility, SunTrax, to create a high-tech hub for the research, development and testing of emerging transportation technologies related to tolling, intelligent transportation systems (ITS) and automated and connected vehicles. The initial phase of the project will focus on the construction of a toll testing facility expected to offer local and potentially national a
  • Eversheds gets Dartford Crossing deal flowing for Highways Agency
    October 22, 2013
    Global law firm Eversheds has advised the UK’s Highways Agency on the US$592 million contract for the implementation of a new free-flow charging system at M25 Dartford-Thurrock River Crossing. New technology which utilises number-plate recognition technology will allow drivers to use the crossing without having to stop at the barriers to hand over payment. Road users will be able to pay through a variety of methods including telephone, text, online and at retail outlets. Pre-paid accounts which qualify
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly