Skip to main content

Proterra to deliver North Carolina's first electric airport passenger bus fleet

Heavy-duty electric transportation manufacturer Proterra is to supply Raleigh-Durham Airport (RDU) Authority in the US with four Proterra Catalyst E2 zero-emissions battery-electric transit buses and related charging infrastructure. Currently, RDU has 14 diesel-powered transit buses that are replaced every 7-10 years. The new buses will replace four older diesel buses on trips between the airport’s two ParkRDU Economy lots and terminals.
August 18, 2017 Read time: 1 min

Heavy-duty electric transportation manufacturer Proterra is to supply Raleigh-Durham Airport (RDU) Authority in the US with four Proterra Catalyst E2 zero-emissions battery-electric transit buses and related charging infrastructure.

Currently, RDU has 14 diesel-powered transit buses that are replaced every 7-10 years. The new buses will replace four older diesel buses on trips between the airport’s two ParkRDU Economy lots and terminals.

Related Content

  • May 23, 2022
    Replace short car trips with e-bikes: report
    Relatively small changes of mode would have big knock-ons in CO2 savings, says Bike Adviser
  • May 18, 2016
    Indian tech company wins award for turning diesel buses into EVs
    The International Transport Forum (ITF) has awarded India-based technology firm, KPIT Technologies, the Promising Innovation in Transport Award 2016, for its development of a system that can convert new as well as existing diesel buses into full electric buses. KPIT’s smart electric bus technology is modular and highly versatile, making is possible to retrofit different vehicle types from mini buses to large 12-metre public transport buses. The first bus retrofitted by KPIT went into serviced in 2015
  • April 19, 2012
    Another section of West Coast Green Highway EV charging infrastructure announced
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • April 28, 2021
    US governors want swift action on ZEVs
    Call for US to lead world in zero-emission vehicles marketplace while creating good jobs