Skip to main content

Pre-qualified bidders for bridge over Panama Canal announced

The consortium made up of Acciona Infraestructuras and Tradeco from Spain and Mexico and the consortium made up of Odebrecht and Hyundai Joint Venture from Brazil and South Korea plus Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal. The second stage of the selection process will involve the client Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6
April 3, 2012 Read time: 1 min
The consortium made up of 4744 Acciona Infraestructuras and 4743 Tradeco from Spain and Mexico and the consortium made up of 4740 Odebrecht and 1684 Hyundai Joint Venture from Brazil and South Korea plus 4742 Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal.

The second stage of the selection process will involve the client 4745 Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6km long bridge will be built in an inverted 'Y' shape and it will include four lanes for traffic.

Related Content

  • August 28, 2013
    Riyadh metro contracts awarded
    The contracts for the design and construction of Riyadh’s new US$22.5 billion metro system, the next major step in the development of the largest public transport project in the world - the Riyadh Public Transport Project. The Project encompasses a city-wide metro, bus network, and park and ride services. The Arriyadh Development Authority (ADA) has announced that Riyadh Metro Transit Consultants (RMTC), a joint venture between US firm Parsons and French firms Egis and Systra, has been awarded the first
  • February 14, 2017
    Parsons wins Engineering Excellence Grand Award
    US engineering services firm Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road. Built in 1957, the existing
  • February 3, 2012
    South Africa's first multi-lane free-flow tolling top of the line
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.
  • June 15, 2020
    Thales signs deals with China, Korea, Turkey
    French firm closes three signal control contracts for urban rail systems