Skip to main content

Pre-qualified bidders for bridge over Panama Canal announced

The consortium made up of Acciona Infraestructuras and Tradeco from Spain and Mexico and the consortium made up of Odebrecht and Hyundai Joint Venture from Brazil and South Korea plus Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal. The second stage of the selection process will involve the client Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6
April 3, 2012 Read time: 1 min
The consortium made up of 4744 Acciona Infraestructuras and 4743 Tradeco from Spain and Mexico and the consortium made up of 4740 Odebrecht and 1684 Hyundai Joint Venture from Brazil and South Korea plus 4742 Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal.

The second stage of the selection process will involve the client 4745 Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6km long bridge will be built in an inverted 'Y' shape and it will include four lanes for traffic.

Related Content

  • November 13, 2012
    Traffic to flow freely over world’s widest bridge
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • September 6, 2017
    Remote remedies help US authorities identify bridge deficiencies
    Every day 185 million vehicles – cars, trucks, school buses, emergency response units - cross one or more of America’s 55,710 'structurally compromised' steel and concrete road bridges, the highest concentration of which are in Iowa (nearly 5,000), Pennsylvania and Oklahoma. Nearly 2,000 of these crossings are located on interstate highways, according to the American Road and Transportation Builders Association's recent analysis of the US Department of Transportation's 2016 National Bridge Inventory.
  • January 9, 2015
    Chinese company confirms Mexico train tender plans
    China Railway Construction Corp (CRCC) has confirmed its intention to participate in the new tender for the US$3.4 billion Mexico City-Querétaro high-speed rail project. Mexico's transport and communications ministry (SCT) said draft bidding rules for the new tender would be published on 14 January. The project calls for the construction of a 210km high-speed rail link connecting Mexico and Querétaro, via the cities of Cuatitlán and Tula. The high speed train will run for 210 kilometres between Buenav
  • January 3, 2024
    Yutraffic Varia chosen for Sydney's new harbour crossing
    Western Harbour Tunnel is being built to take pressure off existing routes in Australian city