Skip to main content

Pre-qualified bidders for bridge over Panama Canal announced

The consortium made up of Acciona Infraestructuras and Tradeco from Spain and Mexico and the consortium made up of Odebrecht and Hyundai Joint Venture from Brazil and South Korea plus Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal. The second stage of the selection process will involve the client Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6
April 3, 2012 Read time: 1 min
The consortium made up of 4744 Acciona Infraestructuras and 4743 Tradeco from Spain and Mexico and the consortium made up of 4740 Odebrecht and 1684 Hyundai Joint Venture from Brazil and South Korea plus 4742 Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal.

The second stage of the selection process will involve the client 4745 Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6km long bridge will be built in an inverted 'Y' shape and it will include four lanes for traffic.

For more information on companies in this article

Related Content

  • Test 7th January 2016 News 1
    January 6, 2016
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
  • App informs drivers of delays during Long Beach bridge replacement
    June 6, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • Arizona chooses consortium for its largest-ever highway project
    January 4, 2016
    The Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway. The consortium includes Fluor Enterprises, Granite Construction and Ames Construction, with Parsons Brinckerhoff as the lead designer. The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised
  • JV wins multi-billion dollar West Gate Tunnel project
    April 11, 2017
    CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui