Skip to main content

Pre-qualified bidders for bridge over Panama Canal announced

The consortium made up of Acciona Infraestructuras and Tradeco from Spain and Mexico and the consortium made up of Odebrecht and Hyundai Joint Venture from Brazil and South Korea plus Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal. The second stage of the selection process will involve the client Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6
April 3, 2012 Read time: 1 min
The consortium made up of 4744 Acciona Infraestructuras and 4743 Tradeco from Spain and Mexico and the consortium made up of 4740 Odebrecht and 1684 Hyundai Joint Venture from Brazil and South Korea plus 4742 Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal.

The second stage of the selection process will involve the client 4745 Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6km long bridge will be built in an inverted 'Y' shape and it will include four lanes for traffic.

For more information on companies in this article

Related Content

  • Emovis extends Mersey toll deal
    March 29, 2022
    Abertis-owned group's new contract for crossings near Liverpool, England, run to 2029
  • Brazil-Argentina to build São Paulo monorail
    August 27, 2014
    A Brazilian-Argentine consortium, ABC Integrado, is to build, operate and maintain the US$1.84 billion metro line 18 monorail in the city of São Paulo, Brazil. The consortium, which was the sole bidder for the contract, is made up of local engineering group Primav, which controls highway operator EcoRodovias, local construction companies Encalso and Cowan, and Argentina's Benito Roggio Transportes. The 25-year concession calls for building a 15 kilometre monorail, with 13 stations from São Paulo city
  • Wireless bridges widen options for ITS upgrades
    December 9, 2014
    Antaira Technologies’ marketing engineer Brian Roth explains why the increasing capacity of wireless bridges is reducing the cost of expanding and upgrading ITS networks. With more than half of the world’s population now living in cities, the need for efficient transportation of both people and goods has never been greater and that pressure is unlikely to ease any time soon. Indeed in many regions of the world the rate of urbanisation is still increasing as the demand for rural workers continues to decline.
  • Bridge & tunnel management: seeing the bigger picture
    September 10, 2024
    A variety of technologies are available to monitor the health of critical infrastructure – and to keep the drivers who use it safe by flagging incidents while reducing false alarms