Skip to main content

Pre-qualified bidders for bridge over Panama Canal announced

The consortium made up of Acciona Infraestructuras and Tradeco from Spain and Mexico and the consortium made up of Odebrecht and Hyundai Joint Venture from Brazil and South Korea plus Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal. The second stage of the selection process will involve the client Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6
April 3, 2012 Read time: 1 min
The consortium made up of 4744 Acciona Infraestructuras and 4743 Tradeco from Spain and Mexico and the consortium made up of 4740 Odebrecht and 1684 Hyundai Joint Venture from Brazil and South Korea plus 4742 Vinci Construction Grands Projets from France have pre-qualified in the tender for the construction of a new bridge at the Atlantic side of the Panama Canal.

The second stage of the selection process will involve the client 4745 Panama Canal Authority (ACP) sending the contract terms and conditions to bidders. The 75m high and 4.6km long bridge will be built in an inverted 'Y' shape and it will include four lanes for traffic.

Related Content

  • July 30, 2013
    Contracts awarded for Riyadh six-line metro
    The government in Riyadh, Saudi Arabia, has awarded three engineering and construction packages for its six-line metro project. The contracts, worth around US$22 billion, have been awarded to a consortium of the US's Bechtel, Germany's Siemens, the regional Consolidated Contractors Company and Saudi Arabia's Almabani; a consortium led by Italy's Ansaldo STS; Spain's Fomento de Construcciones y Contratas (FCC), France's Alstom and South Korea's Samsung C&T.
  • February 14, 2014
    Parsons Brinckerhoff to provide quality control for Cleveland bridge
    Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
  • June 22, 2016
    EBRD supports extension of Romanian motorway network and trans-European links
    The European Bank for Reconstruction and Development (EBRD) is supporting the construction of new sections of the D4 highway and the R7 expressway in the Slovak Republic with debt facilities of up to US$159 million (€150 million). The funds are part of a larger package totaling US$987 million (€875 million) provided to the concessionaire Zero Bypass under a public-private partnership (PPP) scheme. Other participants include the European Investment Bank (EIB), the Slovak Investment Holding, Instituto de
  • December 16, 2013
    Road weather information system combines traffic information
    A new road weather information system developed by Hyundai Engineering and Construction (Hyundai E&C) can provide drivers with reliable real-time traffic and road condition information, says the company. The system, developed in concert with Hyundai Motor Company and Hyundai Mobis, can help alert drivers of traffic congestion and potentially hazardous road conditions up ahead by collecting data from all cars, such as ambient temperatures and road conditions. It also processes information from various roa