Skip to main content

PPP wins US$4bn metro in São Paulo

A consortium composed of Brazilian engineering companies Odebrecht Transport and Queiroz Galvão and local groups UTC Participações and Eco Realty-Fundo de Investimento em Participações, has won a tender to build and operate the upcoming US$3.9 billion metro line 6 located in south-eastern Brazil's São Paulo city. Also known as the Laranja (orange) line, the subway will run some 15.9 kilometres between the Brasilândia and San Joaquin stations, with fifteen stations in all. It will connect the universitie
November 8, 2013 Read time: 1 min
A consortium composed of Brazilian engineering companies 4740 Odebrecht Transport and Queiroz Galvão and local groups UTC Participações and Eco Realty-Fundo de Investimento em Participações, has won a tender to build and operate the upcoming US$3.9 billion metro line 6 located in south-eastern Brazil's São Paulo city.

Also known as the Laranja (Orange) line, the subway will run some 15.9 kilometres between the Brasilândia and San Joaquin stations, with fifteen stations in all. It will connect the universities of FAAP, PUC and others in the Liberdade neighbourhood.

The 25-year concession period includes six years to build the line, starting in 2014, and nineteen years for commercial operations. Once completed, Line 6 is expected to transport 637,000 passengers per day.

A contract for the 25-year public-private partnership (PPP) should be signed by the end of the year, according to the São Paulo state government.

For more information on companies in this article

Related Content

  • New Mexico City airport 'the most advanced worldwide'
    February 13, 2015
    The new international airport being built in Mexico City is "probably the most advanced modern airport project worldwide," Dr Bernardo Lisker, international director of The Mitre Corporation, has said. "This is an enormously important project for Mexico, without which the nation's economy would suffer a bottleneck very soon," said Lisker, who will be discussing the technical vision of the airport at BNamericas' Mexico Infrastructure Summit taking place 18–19 February. "Building the new airport in the
  • ASECAP examines tolling’s trials, tribulations and triumphs
    September 4, 2018
    If you want to get up to speed on the main issues facing the transport sector and tolling companies, ASECAP Study Days event in Ljubljana was a good place to start. Colin Sowman reports (Photographs: Louis David). Increasing populations, ever-higher technical and safety requirements, and electric and hybrid vehicles will provide both challenges and opportunities for tolling companies. The annual Study Days event organised by ASECAP (the European association for tolling companies) examined all of these aspec
  • Irish tunnel contracts awarded to Egis
    October 16, 2014
    Ireland’s National Roads Authority (NRA) has awarded Egis the renewal and extension of the operation and maintenance contract of the Dublin Tunnel for a period of six years, with a possible four-year extension. This new contract follows a first operation and maintenance contract awarded to the Group in February 2006 and includes the toll collection, traffic and safety management and routine maintenance, including winter and equipment maintenance. It also includes the operation and maintenance of the
  • Diverse development of tolling business models
    April 25, 2013
    A diversity of tolling business models offers a wider toolbox of highway finance options, as the IBTTA’s Patrick Jones explains. The business models for America’s tolled highways have gone through several different evolutions over the last 75 years, reflecting a succession of shifts in transportation policy and politics, financing and funding models, urban patterns, customer needs, and technology. And with more and more decision-makers expressing renewed interest in tolling, it’s that very diversity that ma