Skip to main content

Pöyry takes major role in Helsinki City rail loop design

In a contract worth US$6.4 million, Finnish engineering firm Pöyry is to design the Vauhtitie underpass bridge, the opening of the nearby railway tunnel, and the road layout of the Vauhtitie area of Helsinki for the Helsinki City rail loop. In addition, Pöyry's water maintenance network designers will design the pipe and cable transfers required by the rail loop. Pöyry architects are also involved in the design of the Hakaniemi station and its road tunnels. The Helsinki City rail loop is a commuter rail
January 10, 2014 Read time: 2 mins
In a contract worth US$6.4 million, Finnish engineering firm 6727 Pöyry is to design the Vauhtitie underpass bridge, the opening of the nearby railway tunnel, and the road layout of the Vauhtitie area of Helsinki for the Helsinki City rail loop. In addition, Pöyry's water maintenance network designers will design the pipe and cable transfers required by the rail loop. Pöyry architects are also involved in the design of the Hakaniemi station and its road tunnels.

The Helsinki City rail loop is a commuter rail loop to be built underneath the centre of Helsinki. Pöyry is also responsible for rock construction and geological planning in the Töölö area, and will carry out bedrock surveys on the eastern side of the loop.
 
"Pöyry's wide experience in the design of railways and underground construction makes them a good partner in this significant project," says project manager Jussi Lindberg from the Finnish Transport Agency.
 
The total value of the above assignments is US$6.4 million. The order was recognised in the Regional Operations business stock in Q4.

For more information on companies in this article

Related Content

  • US state DoTs in path of Hurricane Idalia take emergency measures
    August 30, 2023
    Florida and Georgia are braced for impact of Category 3 storm with 125mph winds
  • Cost saving multi-agency transportation and emergency management
    May 3, 2012
    Although the recession had dramatically reduced traffic volumes in the past few years, the economy was on the brink of a recovery that portended well for jobs but poorly for traffic congestion. Leaders of four government agencies in Houston, Texas, got together to discuss how to collectively cope with the expected increase in vehicles on the road. "They knew they couldn't pour enough concrete to solve the problem, and they also knew the old model of working in a vacuum as standalone entities would fail," sa
  • Details of new Dartford Crossing safety system unveiled
    January 21, 2015
    Since it launched on 30 November last year, Dart Charge has already helped to speed up journeys by removing the need to stop at a barrier to pay the Dartford Crossing charge. To get the most benefit from the changes, the UK Highways Agency has developed a new way of identifying and managing over-height vehicles and dangerous loads before they enter the tunnel, a job that until now was carried out at the payment barriers. All major tunnels have rules about what substances can be taken through them an
  • Michael Baker International to aid SEPTA’s ‘Rebuilding the System’ program
    August 17, 2016
    As part of its Rebuilding the System Program, the South Eastern Pennsylvania Transportation Authority (SEPTA) in the US has awarded Michael Baker International a three-year, US$8-million contract to provide general engineering, construction management and inspection services to a range of SEPTA projects throughout south-eastern Pennsylvania. As part of the contract, the Michael Baker team will support SEPTA in their management of complex construction projects with the goal of ensuring quality, enhanci