Skip to main content

Pöyry to design Helsinki’s Western Metro extension

Finnish consulting and engineering company Pöyry is to provide design services for the eight kilometre Western Metro extension in Espoo, the third largest city in Finland. It will be part of the metro system in the Helsinki capital region. The US$8.25 million contract, awarded by Länsimetro Oy, will bring the metro within the reach of 50,000 people in south-western parts of Espoo, and is expected to be complete by 2018. Pöyry has also provided track engineering, rock and geotechnical engineering, architect
April 11, 2013 Read time: 2 mins
Finnish consulting and engineering company 4201 Pöyry is to provide design services for the eight kilometre Western Metro extension in Espoo, the third largest city in Finland. It will be part of the metro system in the Helsinki capital region.  The US$8.25 million contract, awarded by Länsimetro Oy, will bring the metro within the reach of 50,000 people in south-western parts of Espoo, and is expected to be complete by 2018.

Pöyry has also provided track engineering, rock and geotechnical engineering, architectural design and structural engineering services for the first phase of the Western Metro line, which is currently under construction and is scheduled to be in operation in 2015.
 
"We want to introduce a quick and sustainable means of transport for the citizens and this Metro extension is an important part of the city development. I believe that Pöyry's experience in several rail and tunneling projects will significantly contribute to the project." says Mr Olavi Louko, director of technical and environment services, City of Espoo.

For more information on companies in this article

Related Content

  • Metro to slash greenhouse gas in Washington
    May 1, 2019
    The Washington Metropolitan Area Transit Authority (Metro) has introduced a five-year Energy Action Plan to reduce energy usage and cut greenhouse gas emissions in the US capital. Once fully implemented, it is expected to net $16 million annually in energy cost savings and another $13 million in savings on operations and maintenance expenses by 2025. The plan is part of a commitment by Metro to invest $65m from its capital budget by 2025 in energy efficiency technology, modernise operations and redu
  • Louis Berger awarded Mumbai Metro Line four contract
    April 12, 2018
    The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
  • Car to car communications a step closer
    December 14, 2012
    Vehicle manufacturers have targeted 2015 for the first cars to roll off European assembly lines fitted with operational V2X technology. They and their partners in the Car 2 Car Communications Consortium are confident of meeting the target, reports Jon Masters. Around three years from now vehicles should be appearing in showrooms boasting the capability of communicating with each other. Manufacturers will have started fitting the first proprietary car-to-car driver-aid safety devices and deployment of ‘vehic
  • Taking tolling towards new opportunities
    May 18, 2016
    Vinci’s André Broto presented his views on how the tolling industry could play an important role in helping authorities ease urban congestion, to delegates at the IBTTA conference. As director of foresight and strategy at Vinci Autoroutes, France, André Broto has been spending some time considering the future of tolling in his own country and worldwide. He presented his thoughts, which include a very different angle of the causes of, and solutions to, congestion at the IBTTA’s (International Bridge, Tunnel