Skip to main content

Poterra launches high power interoperable EV charging technology

Electric vehicle (EV) firm Poterra has released three high-power charging options which it claims will make a completely electric bus fleet in North America more achievable. The new products are intended to be compatible with J1772 CCS plug-in, as well as J3105 inverted and roof-mounted overhead charging systems. The company says the systems are capable of bi-directional, vehicle-to-grid power flow.
May 10, 2018 Read time: 2 mins
Electric vehicle (EV) firm Poterra has released three high-power charging options which it claims will make a completely electric bus fleet in North America more achievable.


The new products are intended to be compatible with J1772 CCS plug-in, as well as J3105 inverted and roof-mounted overhead charging systems. The company says the systems are capable of bi-directional, vehicle-to-grid power flow.

Proterra adds that its 60kW Power Control System is ideal for fleets with longer available charge times at the depot and can recharge vehicles in approximately six hours. The 125kW option provides a full charge in under three hours and is therefore aimed at fleets with higher uptime requirements. Meanwhile, the company’s 500kW solution is intended to deliver overhead charging on-route or at the depot for 38 miles in ten minutes.

In addition, Proterra is working with developer of overhead charging hardware Schunk Carbon Technology to create a fleet charging infrastructure for on-route or in-depot charging. The solution will be launched with the intention of supporting heavy-duty EVs that use Schunk’s overhead pantograph systems.

Related Content

  • RAC Foundation: National charge point network needed for electric vehicles
    October 4, 2017
    Potential purchases of electric vehicles with have limited widespread impact without a national charge point network, particularly on motorways and major A-Roads, according to a report by the RAC Foundation. Report author Harold Dermot outlines several challenges that need addressing.Currently, 80% of EV owners have access to home charging, but 93% use the public charging network.
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • Research shows smart charging can be key solution to challenge of network demand from EVs
    September 5, 2017
    The UK Electric Nation project is due to announce its initial findings on the first day of the Cenex Low Carbon Vehicle event (LCV2017) this week, which will show that smart charging can provide a key solution to the challenge of the demand from increasing numbers of electric vehicles (EVs) on electricity networks.
  • Neuron EV launches autonomous shuttle
    May 16, 2019
    Neuron EV has launched a smart transportation shuttle called Hub which it says integrates renewable energy, telecommunications and cloud computing for ease of mobility. The firm claims Hub can operate as an autonomous ride-sharing service or as an emergency vehicle. For ride-sharing, the six-seated electric vehicle (EV) can run autonomously within a five-mile radius. The input or scan of a blockchain ID allows a Hub service to operate without reservations while traffic detection software directs the