Skip to main content

Portland international airport installs EV charging stations

In the largest installation of commercial electric vehicle chargers at an airport in the United States, Portland International Airport (PDX) now has 42 L1 PowerPost electric vehicle (EV) charging stations in place. PowerPost level 1 commercial electric vehicle charging stations, designed and manufactured by Telefonix, feature an integrated retractable cord reel, which keeps cables off the ground, reducing maintenance and tripping hazards. Their low current requirements allow for an efficient use of ener
August 18, 2015 Read time: 2 mins
In the largest installation of commercial electric vehicle chargers at an airport in the United States, Portland International Airport (PDX) now has 42 L1 PowerPost electric vehicle (EV) charging stations in place.

PowerPost level 1 commercial electric vehicle charging stations, designed and manufactured by Telefonix, feature an integrated retractable cord reel, which keeps cables off the ground, reducing maintenance and tripping hazards. Their low current requirements allow for an efficient use of energy, while level 1 charging is well suited for long-dwell parking that is typical at airports and workplaces and enables EV drivers to recover about five miles of range for every hour they are plugged in.

"This installation makes a huge statement," says Bill Williams, business development manager for Telefonix, EVSE Division. "The electric vehicle movement is gaining steam and will continue to do so. Facilities like PDX are acknowledging this growing community and sending a signal that they support those who are embracing electric vehicles by installing stations for both airport employees and travellers."

"We are excited to support our travellers and employees with these new EV charging stations," says Vince Granato, Port of Portland chief operations officer. The installation of EV charging stations is one of our many environmental initiatives, which are central to how we do business and serve as good community stewards."

Related Content

  • Changes needed to Italy's enforcement tendering?
    February 2, 2012
    Fixed penalty notices KRIA's co-founder and President Stefano Arrighetti discusses the events which led up to investigations into the fraudulent use of his company's T-RED red light enforcement system and his house arrest. Looking forward, he says, there needs to be fundamental reform of how Italy goes about the enforcement contract tendering process
  • Hyperloop: from sci-fi to transport policy
    April 16, 2020
    The future is here. While it has long looked like something from a sci-fi movie, Graham Anderson investigates a technology whose time might have come.
  • TfL appoints electric vehicle charge point operators
    April 27, 2017
    Transport for London (TfL) has appointed the Centrica Consortium, BluepointLondon, Chargemaster, Electricity Supply Board (ESB) and Fastned to provide the rapid charging points that the capital needs for electric vehicles. They will fund, maintain, operate and install the network. The first charge points are expected to be operational within a few months and will power vehicles in close to 30 minutes, compared with the three to four hours when using a standard unit. The initial aim is to see 75 charging poi
  • How can US transportation be ‘re-envisioned’?
    October 17, 2019
    In her address to this year’s ITS America Annual Meeting, congresswoman Eleanor Holmes Norton, chair of the House Subcommittee on Highways and Transit, called for a ‘re-envisioning’ of transportation. Her speech is below – and ITS International asks a number of US experts what they would like to see ‘re-envisioned’…

    I would like to welcome  ITS America to the nation’s capital.