Skip to main content

Portland international airport installs EV charging stations

In the largest installation of commercial electric vehicle chargers at an airport in the United States, Portland International Airport (PDX) now has 42 L1 PowerPost electric vehicle (EV) charging stations in place. PowerPost level 1 commercial electric vehicle charging stations, designed and manufactured by Telefonix, feature an integrated retractable cord reel, which keeps cables off the ground, reducing maintenance and tripping hazards. Their low current requirements allow for an efficient use of ener
August 18, 2015 Read time: 2 mins
In the largest installation of commercial electric vehicle chargers at an airport in the United States, Portland International Airport (PDX) now has 42 L1 PowerPost electric vehicle (EV) charging stations in place.

PowerPost level 1 commercial electric vehicle charging stations, designed and manufactured by Telefonix, feature an integrated retractable cord reel, which keeps cables off the ground, reducing maintenance and tripping hazards. Their low current requirements allow for an efficient use of energy, while level 1 charging is well suited for long-dwell parking that is typical at airports and workplaces and enables EV drivers to recover about five miles of range for every hour they are plugged in.

"This installation makes a huge statement," says Bill Williams, business development manager for Telefonix, EVSE Division. "The electric vehicle movement is gaining steam and will continue to do so. Facilities like PDX are acknowledging this growing community and sending a signal that they support those who are embracing electric vehicles by installing stations for both airport employees and travellers."

"We are excited to support our travellers and employees with these new EV charging stations," says Vince Granato, Port of Portland chief operations officer. The installation of EV charging stations is one of our many environmental initiatives, which are central to how we do business and serve as good community stewards."

Related Content

  • The cost benefits of LED traffic signals
    July 16, 2012
    On 11 January 2005, the Kentucky Transportation Cabinet (KYTC) began installing GELcore LED traffic signal modules state-wide through an Energy Savings Performance Contract. In tendering for the work, the energy service contractors could choose any manufacturers equipment but all of them proposed to use the GELcore brand.
  • Evolt wins a place on Scottish EV charging Framework
    June 14, 2016
    Evolt, the electric vehicle (EV) charge point supplier and part of the Swarco group, has been selected by the Energy Saving Trust (EST) as one of the companies to provide EV charging solutions on a new Scotland-wide framework agreement. The new framework includes the right to tender, be selected, or quote for the installation of rapid, commercial and domestic charging units on the mainland and in the Highlands and Islands. The announcement follows a full tender and is effective immediately to an initial
  • Is GIS modelling the answer to the implications of age?
    January 26, 2012
    Geoff Zeiss of Autodesk talks about the convergence going on between GIS and other software systems which will revolutionise the design and construction of nations' utilities. The issue is that we're getting old. But forget the discovery of body hair in places it never used to be, whether or not to dye, contact lenses versus glasses - in fact, put aside entirely the decision to age gracefully or outrageously; the personal implications pale next to the effects on wider society. Faced with the problem of how
  • Vancouver's metro transport promotes alternatives to driving
    January 26, 2012
    David Crawford looks at Vancouver and the legacy of a Olympic transport success