Skip to main content

Portland international airport installs EV charging stations

In the largest installation of commercial electric vehicle chargers at an airport in the United States, Portland International Airport (PDX) now has 42 L1 PowerPost electric vehicle (EV) charging stations in place. PowerPost level 1 commercial electric vehicle charging stations, designed and manufactured by Telefonix, feature an integrated retractable cord reel, which keeps cables off the ground, reducing maintenance and tripping hazards. Their low current requirements allow for an efficient use of ener
August 18, 2015 Read time: 2 mins
In the largest installation of commercial electric vehicle chargers at an airport in the United States, Portland International Airport (PDX) now has 42 L1 PowerPost electric vehicle (EV) charging stations in place.

PowerPost level 1 commercial electric vehicle charging stations, designed and manufactured by Telefonix, feature an integrated retractable cord reel, which keeps cables off the ground, reducing maintenance and tripping hazards. Their low current requirements allow for an efficient use of energy, while level 1 charging is well suited for long-dwell parking that is typical at airports and workplaces and enables EV drivers to recover about five miles of range for every hour they are plugged in.

"This installation makes a huge statement," says Bill Williams, business development manager for Telefonix, EVSE Division. "The electric vehicle movement is gaining steam and will continue to do so. Facilities like PDX are acknowledging this growing community and sending a signal that they support those who are embracing electric vehicles by installing stations for both airport employees and travellers."

"We are excited to support our travellers and employees with these new EV charging stations," says Vince Granato, Port of Portland chief operations officer. The installation of EV charging stations is one of our many environmental initiatives, which are central to how we do business and serve as good community stewards."

Related Content

  • The importance of going with the flow
    April 6, 2018
    Ensuring worker safety and up-to-date driver information is crucial to ensure that roadworks are not a source of danger and delay. Andrew Williams looks at a scheme on the A14 in Cambridgeshire, UK. In recent years, portable workzone ITS solutions have emerged as important tools in the management of major roadworks and system upgrade projects - and are viewed as an increasingly vital means of ensuring any ongoing traffic flow disruption is kept to a minimum. The technology forms a central component of an
  • Tyres ‘could charge EV batteries’
    March 11, 2015
    Unveiled at the recent Geneva Motor Show, two concept tyres by Goodyear could radically change the role of car tyres in the future according to the company. The first concept, named BHO3, offers the possibility of charging the batteries of electric cars by transforming the heat generated by the rolling tyre into electrical energy. The second concept, Triple Tub, contains three tubes that adjust tyre inflation pressure in response to changing road conditions, delivering new levels of performance and versatil
  • Plans for eVTOL service around California's Bay Area
    July 3, 2024
    Archer plans air mobility network to cut journey times in environs of San Francisco
  • Fluor chosen for LA International Airport Automated People Mover
    February 5, 2018
    Fluor Corporation (Fluor) has been chosen to lead the design-build joint venture team to operate and maintain the Los Angeles International Airport (LAX) Automated People Mover project for the Los Angeles World Airports (LAWA). It aims to provide passengers and employees with reliable and time-certain access to the airline terminals with the design and construction commencing later this year. The passenger service is scheduled for 2023.