Skip to main content

Plans submitted for UK’s Luton Airport Gateway

Knight Architects and Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station. The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a f
March 7, 2017 Read time: 2 mins
Knight Architects and 7942 Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station.

The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a fully-automated, two-way, 24-hour capable people-mover based on latest system technology and design innovation running alongside the mainline railway before crossing over Airport Way via the new landmark bridge.

The London Luton Gateway Bridge has been designed as an asymmetric truss structure, spanning 72m across the busy Airport Way. Its top chord traces a parabola which springs tangentially from the deck, before tapering to a slender profile which appears to fade into the distance.

At night the top chord is illuminated with an active-led system. attached directly to the structure and aimed downwards. This allows the lighting system safely operate in its airport environment, without interfering with the functional lighting behind.

Subject to planning permission, work could begin in late 2017, with the system ready for operation by spring 2021.

Related Content

  • May 13, 2016
    Registration opens for UK’s first public driverless vehicle trials
    Members of the public can now register to take part in the UK’s first public driverless vehicle trials, due to take place later this year. The trials, which will take place in the Royal Borough of Greenwich, are part of the GATEway (Greenwich Automated Transport Environment) project – a US$11.5 million (£8million) research project to investigate the use, perception and acceptance of autonomous vehicles in the UK. Taking place in the UK Smart Mobility Living Lab @ Greenwich and led by the UK’s Transport
  • June 1, 2016
    B&C Transit modernises Miami-Dade Metrorail’s control systems
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.
  • May 3, 2023
    In the (Vegas) loop
    The Las Vegas Loop Tesla e-taxi service has carried its millionth passenger and is targeting expansion. But what’s it actually like? Liam McLoughlin, editor of EV Charging & Infrastructure, is taken for a ride
  • March 17, 2016
    Boost to infrastructure, autonomous cars in UK budget
    The UK chancellor announced in his spring budget what he called the biggest investment, US$87.5 billion (£61 billion), in transport infrastructure in generations and is increasing capital investment in the transport network by 50 per cent over this Parliament compared to the last. The government plans to establish the UK as a global centre for excellence in connected and autonomous vehicles by establishing a US$24.1 million (£15 million) ‘connected corridor’ from London to Dover to enable vehicles to com