Skip to main content

Peru's ‘chaotic’ traffic problems

Peru's ‘chaotic’ urban transport system generates losses of US$20 billion a year due to health, transport and economic costs, according to state news agency Andina. Luis Gutiérrez, head of Latin American BRT association (SIBRT), said accidents, pollution-caused breathing problems and sedentary-related illnesses cost US$8 billion a year in Peru, while transport-related problems such as time wasted in traffic and higher gasoline consumption cost another US$8 billion. The remaining US$4 billion is the impact o
August 7, 2014 Read time: 2 mins

Peru's ‘chaotic’ urban transport system generates losses of US$20 billion a year due to health, transport and economic costs, according to state news agency Andina.

Luis Gutiérrez, head of Latin American BRT association (SIBRT), said accidents, pollution-caused breathing problems and sedentary-related illnesses cost US$8 billion a year in Peru, while transport-related problems such as time wasted in traffic and higher gasoline consumption cost another US$8 billion. The remaining US$4 billion is the impact on families' budgets.

Gutiérrez said traffic improvements could reduce those costs to US$10 billion a year, adding that Peru would have to invest US$5.75 billion in 12 cities that are home to 50 per cent of the country's population to improve traffic, with 70 per cent of the cost coming from private investors.

Peru is investing heavily to try to alleviate traffic in Lima. Metro line 1 metro line is currently operating, construction for metro line 2 is about to begin, which it is anticipated will cut travel times by 50 per cent, and two others are in the pipeline.

Related Content

  • Zimbabwe needs billions for infrastructure projects
    September 27, 2013
    Zimbabwe requires more than US$33 billion for infrastructure projects over the next 20 years to turn around its economic fortunes, a senior World Bank economist has said. Nadia Piffaretti said infrastructure development should be part of Zimbabwe's long term economic transformation objectives, stating that US$11.3 billion was required for electricity generation-related projects alone while another US$13.4 billion should be allocated towards transport infrastructure development in the coming two decades a
  • Tollers make way as NextNav muscles into 902-928MHz spectrum
    July 30, 2013
    Toll operators and Progeny trade claim and counter claim about the potential ramifications of operating in the 902-928MHz spectrum, as Jon Masters finds out. Two months after the Federal Communications Commission (FCC) determined that Progeny can start commercial operation of its NextNav location finding service, the dust has begun to settle. The tolling industry has had a chance to reflect on how this may impact its operations, in the knowledge that NextNav will share the 902-928MHz frequency band with RFI
  • Reducing incident clear up times, saving money
    January 24, 2012
    In 2007 in Atlanta, Georgia, it took over four hours to open the road after a major commercial vehicle incident. Not any more. Four years ago the Texas Transportation Institute (TTI) cited Atlanta, Georgia as the third-most congested city in the United States. Each traveller in metro Atlanta lost an incredible 57 hours a year to traffic delays, wasting 40 gallons of fuel while sitting in traffic. In 2007, it took nearly four and a half hours to open travel lanes after an average tractor-trailer incident. Th
  • Seleta Reynolds: 'Set a vision, listen to your people & then get out of their way'
    September 12, 2022
    Los Angeles, host of the 2022 ITS World Congress, is a city where the only constant is change, says Seleta Reynolds of LA Metro. Adam Hill finds out about leadership, dream jobs and the 2028 Olympics...