Skip to main content

Pennsylvania transportation cut ‘would jeopardise local jobs’

Cutting highway and bridge work by 25 per cent in any given year, and then sustaining it in the years ahead, would cost Pennsylvania US$1.25 billion in lost economic activity over a five-year period and put as many as 9,600 jobs permanently at risk, the American Road & Transportation Builders Association’s (ARTBA) chief economist told state lawmakers at a recent hearing. Dr Alison Premo Black was invited to testify before the Pennsylvania Senate Transportation committee based on a report she authored on beh
August 2, 2013 Read time: 2 mins
Cutting highway and bridge work by 25 per cent in any given year, and then sustaining it in the years ahead, would cost Pennsylvania US$1.25 billion in lost economic activity over a five-year period and put as many as 9,600 jobs permanently at risk, the American Road & Transportation Builders Association’s (ARTBA) chief economist told state lawmakers at a recent hearing.

Dr Alison Premo Black was invited to testify before the Pennsylvania Senate Transportation committee based on a report she authored on behalf the Associated Pennsylvania Constructors.  It looked at the potential impact of a decrease in the state’s highway and bridge investment from the current US$4.3 billion market to US$3.8 billion in 2017.

“In this scenario, Pennsylvania contractors will demand fewer materials, equipment and supplies as the overall market opportunities decline and they have fewer projects backlogged,” Black explained.

“This would come at a time when investing in Pennsylvania’s infrastructure and economy is extremely important,” she said, noting that of the Commonwealth’s 28,000 miles of roadway eligible for federal aid, 25 per cent are rated not acceptable and need major repairs or replacement.  Over 40 per cent of the bridges in Pennsylvania are rated structurally deficient or functionally obsolete—well above the national average of 23 percent.
 
Black noted her analysis did not take into account the important long-term benefits of infrastructure investment, or the foregone opportunities the Pennsylvania economy would lose.  In economics literature, there is a link between state and local economic growth, and highway and bridge investment.

“A cut in Penn DOT funding could mean that the Commonwealth’s highway and bridge network would be less efficient in the future.  This would increase transportation costs, both time and money, for everyone that uses the system,” Black said.  “Businesses looking to relocate to Pennsylvania may look at the decline in investment as a disincentive and consider moving elsewhere.”

Related Content

  • Travel times halve for tolling converts
    August 5, 2013
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • Counting the environmental costs of ITS deployment
    October 29, 2015
    David Crawford looks at the latest thinking about calculating the benefits associated with the environmental side of ITS schemes. The penny is dropping that some environmental costs “are being shifted outside the traditional bounds of evaluation methods” for ITS-based road transport projects, according to researchers at the UK University of Leeds’ Institute for Transport Studies.
  • Fluor: here's how to fix US infrastructure
    June 14, 2018
    US president Donald Trump’s comments about the country’s ‘crumbling infrastructure’ led many in the ITS sector to spot an opportunity to help with other solutions. David Seaton of Fluor ponders the scale of what’s required and considers some projects which have boosted mobility We can no longer wait for future generations to address this nation’s crumbling infrastructure. We need to act now. The problem is substantial, to say the least. The American Society of Civil Engineers predicts that failing to clo
  • How ITS weathers the storm on I-80
    September 7, 2021
    Weather-related closures on Wyoming’s I-80 can cost as much as $11.7m each. But a new initiative is harnessing V2X technology to prevent snow shutting things down