Skip to main content

Pennsylvania transportation cut ‘would jeopardise local jobs’

Cutting highway and bridge work by 25 per cent in any given year, and then sustaining it in the years ahead, would cost Pennsylvania US$1.25 billion in lost economic activity over a five-year period and put as many as 9,600 jobs permanently at risk, the American Road & Transportation Builders Association’s (ARTBA) chief economist told state lawmakers at a recent hearing. Dr Alison Premo Black was invited to testify before the Pennsylvania Senate Transportation committee based on a report she authored on beh
August 2, 2013 Read time: 2 mins
Cutting highway and bridge work by 25 per cent in any given year, and then sustaining it in the years ahead, would cost Pennsylvania US$1.25 billion in lost economic activity over a five-year period and put as many as 9,600 jobs permanently at risk, the American Road & Transportation Builders Association’s (ARTBA) chief economist told state lawmakers at a recent hearing.

Dr Alison Premo Black was invited to testify before the Pennsylvania Senate Transportation committee based on a report she authored on behalf the Associated Pennsylvania Constructors.  It looked at the potential impact of a decrease in the state’s highway and bridge investment from the current US$4.3 billion market to US$3.8 billion in 2017.

“In this scenario, Pennsylvania contractors will demand fewer materials, equipment and supplies as the overall market opportunities decline and they have fewer projects backlogged,” Black explained.

“This would come at a time when investing in Pennsylvania’s infrastructure and economy is extremely important,” she said, noting that of the Commonwealth’s 28,000 miles of roadway eligible for federal aid, 25 per cent are rated not acceptable and need major repairs or replacement.  Over 40 per cent of the bridges in Pennsylvania are rated structurally deficient or functionally obsolete—well above the national average of 23 percent.
 
Black noted her analysis did not take into account the important long-term benefits of infrastructure investment, or the foregone opportunities the Pennsylvania economy would lose.  In economics literature, there is a link between state and local economic growth, and highway and bridge investment.

“A cut in Penn DOT funding could mean that the Commonwealth’s highway and bridge network would be less efficient in the future.  This would increase transportation costs, both time and money, for everyone that uses the system,” Black said.  “Businesses looking to relocate to Pennsylvania may look at the decline in investment as a disincentive and consider moving elsewhere.”

Related Content

  • Bhatt nomination has ITS approval
    July 25, 2022
    ITS America, IBTTA, ITE & GHSA welcome Joe Biden's FHWA nomination of Shailen Bhatt
  • Integrate systems to reduce roadside infrastructure
    January 27, 2012
    David Crawford reviews promising current developments. Instrumentation of the road infrastructure has grown to become one of the most dynamic sectors of the ITS industry. Drivers for its deployment include global concerns over the commercial and environmental pressures of traffic congestion, the importance of keeping drivers informed throughout their journeys, and the need to reduce accident rates and promote the safety of all road users, for example by enforcing traffic safety rules.
  • Speed reduction measures - carrot or stick?
    January 23, 2012
    In Sweden, marketing company DDB Stockholm employed a mock speed camera as part of a promotional campaign for automotive manufacturer Volkswagen. The result was worldwide online interest and promotion of the debate over excessive speed to the national level. A developing trend in traffic management policy is to look at how to induce road users to modify their behaviour by incentivising change rather than forcing it through the application of penalties. There have been several studies conducted into this; an
  • Managed lanes – the riddle wrapped up in an enigma
    December 15, 2014
    Managed lanes have something of a patchy track record and can pose authorities problems as well as solutions. Many authorities in the US and beyond have converted, or are converting, parts of the highway network into ‘Managed Lanes’ and charging motorists a fee to avoid the delays on the adjoining free use lanes. Some authorities have converted underused High Occupancy Vehicle (HOV) lanes into priced-managed high occupancy/toll lanes (HOT lanes) whereby the price charged can vary depending on a number of fa