Skip to main content

PB/RK&K JV appointed for statewide transport projects in Maryland

PB/RK&K, a joint venture of Parsons Brinckerhoff and RK&K in association with AECOM, has been selected to serve the Maryland Transit Administration (MTA) as an on-call general engineering consultant for statewide transportation projects.
April 17, 2012 Read time: 1 min
RSSPB/RK&K, a joint venture of 4089 Parsons Brinckerhoff and RK&K in association with 3525 AECOM, has been selected to serve the Maryland Transit Administration (MTA) as an on-call general engineering consultant for statewide transportation projects.

Under its contract PB/RK&K will provide project management, project controls, environmental, structural, tunneling, rolling stock, and train signal engineering services during the preliminary and final design phase of any open-ended transportation project throughout the state.  In addition, the JV will perform the associated safety and security, and quality assurance functions for these projects.

PB/RK&K’s principal assignment is the design of Baltimores proposed 22.5 km Red Line light rail system. The project includes 15 surface stations, five underground stations, a section of aerial structure and around 6.5kms of dual-track tunnel.

For more information on companies in this article

Related Content

  • US transportation policy needs to restart to sort shortcomings
    August 2, 2012
    Joshua Schank has no illusions when it comes to what he and the Bipartisan Policy Center are suggesting in Performance Driven: New Vision for US Transportation Policy. Released in June of this year, this major report (see Sidebar, 'The Shift in Thinking') advocates no less than a root-and-branch overhaul of the way in which the US transportation system is run - how money is allocated and how the beneficiaries of that funding are selected. As its name suggests, Schank and his colleagues are urging senior US
  • EU support for rail improvements in the UK to bring faster travel times
    December 12, 2012
    The European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme. The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area. The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single
  • Iteris awarded US National Highway Institute training contract
    December 20, 2013
    Iteris is one of three firms selected to provide traffic design and operations training services to the US National Highway Institute (NHI). Under the five-year indefinite delivery/indefinite quantity (IDIQ) contract, awarded by the Federal Highway Administration (FHWA), fixed price task orders will be issued for the development, update and delivery of instructor-led and distance learning courses covering transportation operations. The National Highway Institute (NHI) plays a vital role in the FHWA’s
  • IBTTA names new president
    January 13, 2015
    A Miami transportation executive, Javier Rodriguez, executive director of the Miami-Dade Expressway Authority (MDX), has been named 2015 president of the International Bridge, Tunnel and Turnpike Association’s (IBTTA). As a transportation leader, Rodriguez is poised to lead IBTTA during this challenging time. Under Rodriguez's leadership, MDX converted its expressways to an all-electronic system. Before joining MDX in 2007, Rodriguez spent 16 years with the Florida Department of Transportation, including