Skip to main content

PB/RK&K JV appointed for statewide transport projects in Maryland

PB/RK&K, a joint venture of Parsons Brinckerhoff and RK&K in association with AECOM, has been selected to serve the Maryland Transit Administration (MTA) as an on-call general engineering consultant for statewide transportation projects.
April 17, 2012 Read time: 1 min
RSSPB/RK&K, a joint venture of 4089 Parsons Brinckerhoff and RK&K in association with 3525 AECOM, has been selected to serve the Maryland Transit Administration (MTA) as an on-call general engineering consultant for statewide transportation projects.

Under its contract PB/RK&K will provide project management, project controls, environmental, structural, tunneling, rolling stock, and train signal engineering services during the preliminary and final design phase of any open-ended transportation project throughout the state.  In addition, the JV will perform the associated safety and security, and quality assurance functions for these projects.

PB/RK&K’s principal assignment is the design of Baltimores proposed 22.5 km Red Line light rail system. The project includes 15 surface stations, five underground stations, a section of aerial structure and around 6.5kms of dual-track tunnel.

For more information on companies in this article

Related Content

  • Upgrades to public transport across Regional Victoria
    March 10, 2017
    The Victorian government in Australia has released a tender for its Road and Rail Minor Works Program, which aims to deliver new car parks, more comfortable waiting areas and better passenger information at train stations across rural and regional Victoria. It also aims to improve cycling infrastructure at stations with new, secure bike cages and hoops to make it easier to ride to the station and catch the train. The US$17 million (AU$22.5 million) program will also upgrade bus stops, signage and acce
  • Hyundai beats pending government mandate with throttle override
    May 3, 2012
    Hyundai in the US has announced that it is fitting brake pedal electronic throttle override capability on all models well before government mandates come into effect. The US government mandate for brake pedal throttle override capability, a component of FMVSS 124 (Accelerator Control Systems), has been under consideration by the National Highway Traffic Safety Administration (NHTSA). However, its final approval and subsequent timing have yet to be determined. Hyundai says its development teams have been les
  • Europe’s EasyWay project accommodates political requirements
    May 29, 2013
    The EasyWay project has evolved to take account of political developments at the European level. By Jason Barnes The European Union’s (EU’s) EasyWay ITS deployment project has its roots in the ambitions of former European Commission President Jacques Delors with regard to truly international networks for energy, information and for transport. Definition of what became known as the Trans-European Transport Network (TEN-T) began back in 1994 with seven working groups. They produced an R&D and policy framework
  • IBTTA: States are ‘not waiting for the Federal Government to act’
    November 5, 2014
    The International Bridge, Tunnel and Turnpike Association (IBTTA) has responded to the US mid-term election results when Republicans seized control of the Senate; Patrick D. Jones, executive director and CEO said: “The transportation ballot initiatives in Maryland, Massachusetts, Texas and Wisconsin are strong evidence that states are not waiting for the federal government to act. "Reflecting ongoing concerns over the future of the federal surface transportation reauthorisation, state and local governme