Skip to main content

PB wins on-call contract for Detroit-Chicago high speed rail project

The Michigan Department of Transportation (MDoT) has awarded an on-call contract to Parsons Brinckerhoff for construction services in support of the agency’s efforts to implement accelerated rail services along a high-speed rail corridor between Pontiac/Detroit and Chicago.
August 3, 2012 Read time: 1 min
The 1688 Michigan Department of Transportation (MDoT) has awarded an on-call contract to 4983 Parsons Brinckerhoff for construction services in support of the agency’s efforts to implement accelerated rail services along a high-speed rail corridor between Pontiac/Detroit and Chicago.

The contract calls for Pb to assist MDoT in overseeing the railroad construction upgrade programme. The effort is expected to include construction engineering, inspection, office technician work, and general project management services.

For more information on companies in this article

Related Content

  • EU support for rail improvements in the UK to bring faster travel times
    December 12, 2012
    The European Union is to co-finance a project to electrify a 58 km section of British rail infrastructure with US$6.5 million from the TEN-T Programme. The project, which was selected for funding under the 2011 TEN-T Annual Call, is part of the Railway/road axis Ireland/United Kingdom/continental Europe TEN-T Priority Project 26, and will bring considerable benefits to rail traffic in the area. The project consists of the works necessary to install a 25kV AC overhead electrification line on a 58 km single
  • Integrated corridor management 'to enhance travel efficiency'
    August 29, 2012
    New systems of software are coming together to form the technological backbone of a project that will apply practically to one corridor in Dallas, but influence travel across a wider area. Dallas Area Rapid Transit (DART) is the lead agency for an extensive Integrated Corridor Management (ICM) project in Dallas, covering an area stretching north east of downtown Dallas, 20 miles long by two miles wide. The corridor is defined loosely by the US-75 freeway and DART’s light rail ‘red line’. These are the theor
  • Siemens awarded TfL maintenance contracts
    August 27, 2014
    Siemens is to maintain traffic control equipment in the north and north-east London regions under two new traffic control maintenance services contracts awarded by Transport for London (TfL). The contracts represent two of the five contracts that will see London’s traffic signals upgraded to the latest energy-saving technology, as well as expanding the use of intelligent traffic signals and new crossings for pedestrians and cyclists. Worth in total around US$525 million for up to eight years, the five co
  • Michael Baker International to aid SEPTA’s ‘Rebuilding the System’ program
    August 17, 2016
    As part of its Rebuilding the System Program, the South Eastern Pennsylvania Transportation Authority (SEPTA) in the US has awarded Michael Baker International a three-year, US$8-million contract to provide general engineering, construction management and inspection services to a range of SEPTA projects throughout south-eastern Pennsylvania. As part of the contract, the Michael Baker team will support SEPTA in their management of complex construction projects with the goal of ensuring quality, enhanci