Skip to main content

PB wins on-call contract for Detroit-Chicago high speed rail project

The Michigan Department of Transportation (MDoT) has awarded an on-call contract to Parsons Brinckerhoff for construction services in support of the agency’s efforts to implement accelerated rail services along a high-speed rail corridor between Pontiac/Detroit and Chicago.
August 3, 2012 Read time: 1 min
The 1688 Michigan Department of Transportation (MDoT) has awarded an on-call contract to 4983 Parsons Brinckerhoff for construction services in support of the agency’s efforts to implement accelerated rail services along a high-speed rail corridor between Pontiac/Detroit and Chicago.

The contract calls for Pb to assist MDoT in overseeing the railroad construction upgrade programme. The effort is expected to include construction engineering, inspection, office technician work, and general project management services.

For more information on companies in this article

Related Content

  • Mott MacDonald Grontmij JV wins Highways Agency’s framework contract
    November 20, 2014
    The Mott MacDonald Grontmij joint venture (MMG JV) is to provide professional engineering design services to support strategic investment in England’s road network. The JV has been appointed on Lot 1 of the Highways Agency’s new US$7.8 billion Collaborative Delivery Framework (CDF), the country’s largest ever framework for the improvement of motorways and major A roads. The Highways Agency’s CDF is Collaborative working practices and knowledge sharing between designers, the Highways Agency, delivery part
  • Michigan fosters real-world testing of workzone ITS
    September 19, 2017
    Turning a ‘problem’ into ‘an opportunity’ is the mantra of just about every business book and Michigan Department of Transportation (MDoT) looks set to achieve that aim in Oakland County, where 29km (18 miles) of the I-75 needs to be reconstructed. Running north-northwest from Detroit, the I-75 carries around 170,000 vehicles per day but, being built in the 1970s, it now requires an additional lane in each direction and upgrading to the latest design and safety standards. Upgrading will be carried out in
  • Funding shortfall for US Interstate upgrades
    May 11, 2012
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str
  • Atkins wins Oslo metro upgrade contract
    March 14, 2012
    Atkins has won design contracts to increase safety, functionality and comfort for travellers on the Oslo Metro, Norway’s rapid transit system.