Skip to main content

Parsons wins Engineering Excellence Grand Award

US engineering services firm Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road. Built in 1957, the existing
February 14, 2017 Read time: 2 mins
US engineering services firm 4089 Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the 1773 Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road.

Built in 1957, the existing three sets of concrete slab bridges were located within a two mile stretch of I-70. To maintain traffic during construction, the westbound single-span bridges were designed and built using slide-in bridge construction (SIBC) in which the new bridges were built adjacent to the old bridges and then slid into their permanent location after the old bridges were demolished. The eastbound spans of these two bridges were constructed using the traditional bridge-building method, where the old bridge is demolished and a new bridge is built in its place. The twin spans of the Business Loop Bridge were replaced with one single-span bridge which also used the SIBC technique. It was positioned in a slightly different location than the old bridge to better accommodate intersecting traffic.

In addition to the designs for accelerated bridge construction, Parsons also provided new interchange designs at Business Loop and Range Line to increase corridor mobility, enhance pedestrian connectivity and improve motorist safety. The Range Line/I 70 interchange was converted from a signalised diamond interchange to two tear shaped roundabouts that join together to form a single roundabout. The Business Loop/I 70 interchange was improved with dual-lane roundabouts on the north and south sides of I 70.

Related Content

  • October 13, 2016
    Jacobs WSP/Parsons Brinckerhoff JV wins engineering excellence award
    The work of a Jacobs WSP/Parsons Brinckerhoff design joint venture on the North Strathfield Rail Underpass (NSRU) in New South Wales has been awarded an Australian Engineering Excellence Award (AEEA), which recognises outstanding achievement in the practice of engineering and service to the profession. The NSRU project was part of the Northern Sydney Freight Corridor Program, a joint Australian and NSW Government initiative to improve the capacity and reliability of freight trains between Strathfield an
  • February 13, 2015
    Siemens to implement motorway junction improvements
    Siemens is to supply and install traffic signals and controllers for two major junction improvements schemes on the M27 motorway in Hampshire, UK. The contracts, which are funded by the UK government’s US$488 million pinch point scheme, have been awarded by civil contractors Interserve Construction and Jackson Civil Engineering and are intended to help alleviate the flow of traffic joining and leaving the busy M27 junctions 3 and 5. The upgrade work, which is already underway, will see additional lane
  • August 19, 2014
    Funding boost for West Midlands transport links
    The UK Department for Transport has agreed to fund a new bridge which will improve links to three of the West Midlands' economic powerhouses, Baroness Kramer has announced. Building work on the new A45 South Bridge in Solihull can start after the government agreed to provide US$13.8 million in funding towards the full project cost of US$20 million. The new bridge will significantly improve a transport link that carries 50,000 vehicles a day and will directly serve Birmingham International Airport, the
  • May 11, 2017
    Lindsay zips-up lane closure solution
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.