Skip to main content

Parsons wins Engineering Excellence Grand Award

US engineering services firm Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road. Built in 1957, the existing
February 14, 2017 Read time: 2 mins
US engineering services firm 4089 Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the 1773 Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road.

Built in 1957, the existing three sets of concrete slab bridges were located within a two mile stretch of I-70. To maintain traffic during construction, the westbound single-span bridges were designed and built using slide-in bridge construction (SIBC) in which the new bridges were built adjacent to the old bridges and then slid into their permanent location after the old bridges were demolished. The eastbound spans of these two bridges were constructed using the traditional bridge-building method, where the old bridge is demolished and a new bridge is built in its place. The twin spans of the Business Loop Bridge were replaced with one single-span bridge which also used the SIBC technique. It was positioned in a slightly different location than the old bridge to better accommodate intersecting traffic.

In addition to the designs for accelerated bridge construction, Parsons also provided new interchange designs at Business Loop and Range Line to increase corridor mobility, enhance pedestrian connectivity and improve motorist safety. The Range Line/I 70 interchange was converted from a signalised diamond interchange to two tear shaped roundabouts that join together to form a single roundabout. The Business Loop/I 70 interchange was improved with dual-lane roundabouts on the north and south sides of I 70.

Related Content

  • January 31, 2012
    Intersection collision avoidance system trial
    Although much of the emphasis of research into intersection management has tended to concentrate on the needs of urban locations, there remain specific issues pertaining to rural intersections which need to be addressed. Here, Rebecca Szymkowski and Greg Helgeson, Wisconsin DOT, Todd Szymkowski, University of Wisconsin-Madison, and Craig Shankwitz and Arvind Menon, University of Minnesota detail progress on an intersection collision avoidance system for more remote locations.
  • January 30, 2012
    Mounting benefits of dynamic tolling project
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • April 8, 2014
    Opening the closed-loop to realise ITS benefits
    Jim Leslie, manager of ITS applications engineering at the Econolite Group looks at practical steps in transitioning from closed-loop masters to a centralised ATMS. Not many years ago the standard method of coordinating signalised intersections in local areas was to install an on-street master – each of which monitored and controlled a limited number of signal controllers or intersections as a closed-loop system. And, to a certain extent, each closed-loop system was autonomous from others deployed by the ag
  • September 7, 2021
    How ITS weathers the storm on I-80
    Weather-related closures on Wyoming’s I-80 can cost as much as $11.7m each. But a new initiative is harnessing V2X technology to prevent snow shutting things down