Skip to main content

Parsons Brinckerhoff to provide quality control for Cleveland bridge

Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
February 14, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is part of the winning design-build team selected by the 7609 Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF).  

The eastbound bridge is part of a phased project that will ultimately demolish the old I-90 viaduct bridge and replace it with eastbound and westbound twin bridges, each carrying five lanes of one-way traffic over the Cuyahoga River Valley. With the westbound bridge now complete and carrying bi-directional traffic, demolition of the old I-90 viaduct bridge has begun and the new eastbound bridge is being designed and built.  As the IQF, Parsons Brinckerhoff is responsible for verifying that all work meets the requirements of the contract documents and the quality program. The firm will also facilitate continuous quality improvements.

Related Content

  • May 10, 2018
    STV selected to design Massachusetts rail extension
    Transport design firm STV has been chosen as lead designer for the Massachusetts Bay Transportation Authority’s (MBTA’s) $1.3bn Green Line Light Rail Extension (GLX). MBTA expects the 4.3 mile expanded route to reduce up to 26,000 regional daily vehicle miles travelled, improving air quality and reducing congestion. Once completed, the increased line will provide commuters in Cambridge, Somerville and Medford with journeys to downtown Boston. Construction is expected to begin later this year, with the se
  • November 13, 2012
    Traffic to flow freely over world’s widest bridge
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • October 19, 2015
    WSP/Parsons Brinckerhoff to manage Los Angeles Metro express lanes
    WSP/Parsons Brinckerhoff has been awarded a contract by the Los Angeles County Metropolitan Transportation Authority (Metro) to serve as its ExpressLanes program management support consultant. Under the contract, WSP/Parsons Brinckerhoff will assist Metro with project initiation, including planning and preliminary engineering; project and program management oversight; and public education, community relations and market research. The primary focus of the new contract is on studying possible extensio
  • September 15, 2014
    Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in