Skip to main content

Parsons Brinckerhoff to provide quality control for Cleveland bridge

Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
February 14, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is part of the winning design-build team selected by the 7609 Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF).  

The eastbound bridge is part of a phased project that will ultimately demolish the old I-90 viaduct bridge and replace it with eastbound and westbound twin bridges, each carrying five lanes of one-way traffic over the Cuyahoga River Valley. With the westbound bridge now complete and carrying bi-directional traffic, demolition of the old I-90 viaduct bridge has begun and the new eastbound bridge is being designed and built.  As the IQF, Parsons Brinckerhoff is responsible for verifying that all work meets the requirements of the contract documents and the quality program. The firm will also facilitate continuous quality improvements.

For more information on companies in this article

Related Content

  • The inside story of how traffic chaos was avoided after I-95 collapse
    August 23, 2023
    June’s collapse of major US roadway I-95 in Pennsylvania could have caused lengthy traffic chaos. But - relatively speaking at least - it didn’t and gridlock was avoided. Alan Dron finds out why
  • Mott MacDonald providing detailed design for Dominica road rehabilitation project
    August 14, 2017
    Mott MacDonald is providing the detailed design for the Loubiere to Bagatelle road rehabilitation project on behalf of the Government of the Commonwealth of Dominica’s Ministry of Public Works and Ports. A grant from the UK’s Department for International Development has been provided to Dominica through the Caribbean Development Bank, following significant damage caused along the road alignment as a result of Tropical Storm Erika in 2015. The project, set over approximately 20km, will see the construction
  • Consortium awarded LRT project in Canada
    February 12, 2016
    TransEd Partners, a consortium including global engineering and construction company Bechtel, has been selected by the City of Edmonton to finance, design, supply vehicles, build, operate, and maintain the first phase of the Edmonton Valley Line Light Rail Transit project. The Valley Line is central to the City of Edmonton's transportation plan, designed to meet the demands of Canada's second fastest-growing city that is expected to increase in size by 50 per cent by 2040.
  • UK digital Railway contracts awarded
    June 21, 2016
    WSP/Parsons Brinckerhoff has been appointed by the UK’s Network Rail to provide design and engineering services on the Digital Railway’s Multi-Functional Design Framework (MFD). The digital railway is a government supported, industry-wide programme aimed at increasing the role of digital technologies to improve capacity, connectivity and reliability. Through the framework WSP/Parsons Brinckerhoff will provide a range of strategic engineering and project management services to support the delivery of the