Skip to main content

Parsons Brinckerhoff to provide quality control for Cleveland bridge

Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
February 14, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff is part of the winning design-build team selected by the 7609 Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF).  

The eastbound bridge is part of a phased project that will ultimately demolish the old I-90 viaduct bridge and replace it with eastbound and westbound twin bridges, each carrying five lanes of one-way traffic over the Cuyahoga River Valley. With the westbound bridge now complete and carrying bi-directional traffic, demolition of the old I-90 viaduct bridge has begun and the new eastbound bridge is being designed and built.  As the IQF, Parsons Brinckerhoff is responsible for verifying that all work meets the requirements of the contract documents and the quality program. The firm will also facilitate continuous quality improvements.

For more information on companies in this article

Related Content

  • Work begins on major southern Vietnam bridge
    October 25, 2013
    Construction has begun on two-kilometre bridge spanning the Tien River in the Mekong Delta in southern Vietnam. The investment of US$145 million is funded by non-refundable aid from the Australian government, a loan from the Asia Development Bank and Vietnamese government capital. The cable-stayed Cao Lanh Bridge, which links Cao Lanh Town and Lap Vo District in Dong Thap Province, will have four lanes for motorised vehicles to run at a speed of 80 kilometres per hour and two other lanes for non-motoris
  • State of the art ITS technology for Doha tunnel management system
    January 31, 2012
    Husam Musharbash, Traffic Tech Group, talks about tunnel management system implementation on the new route between Doha and the soon-to-open New Doha International Airport. The new Ras Abu Aboud Tunnel in Qatar, which opened to traffic in January of this year, will serve the New Doha International Airport once the latter opens in 2011.
  • Funding shortfall for US Interstate upgrades
    May 11, 2012
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str
  • Toll option for new Cape Fear bridge
    June 6, 2025
    North Carolina councillors voted to leave option open for proposed structure