Skip to main content

Parsons Brinckerhoff to modernise Michigan freeway

Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
July 4, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff has been awarded a contract to assist the 1688 Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan.

The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improving the drainage system, enhanced aesthetic treatments developed through intensive stakeholder engagement, and upgrading geometrics and interchanges. One new lane will be added in each direction to serve as an HOV lane during peak periods.

As the owner’s representative, Parsons Brinckerhoff will serve as an extension of the Michigan DOT staff, responsible for multi-year work order tasks to support the DOT in the delivery of both design-build and design-bid-build segments.

The I-75 modernisation corridor is divided into eight segments with the first to be delivered under a design-build contract and the remaining seven segments delivered through design-bid-build. Completion of the overall project is slated for 2032.

For more information on companies in this article

Related Content

  • Latest round of TIGER funding announced
    August 1, 2016
    Nearly US$500 million will be made available for transportation projects across the US in the eighth round of the highly successful and competitive Transportation Investment Generating Economic Recovery (TIGER) grant program. Announcing the funding, US Transportation Secretary Anthony Foxx highlight how this will improve safety and economic opportunity in two US territories, 32 states and 40 communities across the country. This year’s TIGER awards include US$19 million to Pittsburgh, Pennsylvania fo
  • Investment in pedestrian, cycling initiatives pays off
    June 30, 2014
    Five years after the Non-motorised Transportation Pilot Program (NTPP) was established to measure the impact of investment in walking and cycling initiatives, the US Federal Highway Administration (FHWA) has reported a 22.8 per cent increase in walking and a 48.3 per cent increase in cycling, while an estimated 85.1 million vehicle miles were avoided. The NTPP provided approximately US$25 million each to four pilot communities (Columbia, Missouri; Marin County, California; Minneapolis area, Minnesota; an
  • US FY 2016 budget invests heavily in ITS, infrastructure
    February 3, 2015
    Announcing President Obama’s US$94.7 billion Fiscal Year 2016 budget for the US Department of Transportation, Transportation Secretary Anthony Foxx said, “Our budget proposal lays the foundation for a future where our transportation infrastructure meets the demands of a growing population and an economy that depends on the free flow of freight,” said Secretary Foxx. “This Administration is looking towards the horizon – the future – but to do this we need Congress’ partnership to pass a long-term reauthorisa
  • Strabag awarded Polish road construction contracts
    February 1, 2016
    Construction group Strabag, via its Polish subsidiaries, has been awarded two contracts totalling US$117 million by Poland’s General Directorate for National Roads and Highways (GDDKiA). As part of the overall works on the S17, Strabag will design and build a 15.2 km long section from the Lubelska junction near Warsaw to Kołbiel, including four junctions, while the second contract comprises the design and construction of an 8.7 km long bypass road near Kołbiel. The S17, which forms part of the E372, w