Skip to main content

Parsons Brinckerhoff to modernise Michigan freeway

Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
July 4, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff has been awarded a contract to assist the 1688 Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan.

The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improving the drainage system, enhanced aesthetic treatments developed through intensive stakeholder engagement, and upgrading geometrics and interchanges. One new lane will be added in each direction to serve as an HOV lane during peak periods.

As the owner’s representative, Parsons Brinckerhoff will serve as an extension of the Michigan DOT staff, responsible for multi-year work order tasks to support the DOT in the delivery of both design-build and design-bid-build segments.

The I-75 modernisation corridor is divided into eight segments with the first to be delivered under a design-build contract and the remaining seven segments delivered through design-bid-build. Completion of the overall project is slated for 2032.

For more information on companies in this article

Related Content

  • Inrix expands traffic data programme collaboration
    October 12, 2012
    Nearly a year after the I-95 Corridor Coalition, the University of Maryland (UMD) and Inrix announced a three-year expansion of the Vehicle Probe Project (VPP), the coalition and its partners are expanding their collaboration once again. Through a Federal Highway Administration (FHWA) Awards Grant, the coalition will use Inrix traffic information to expand coverage to over 40,000 miles of roads across fourteen states.
  • Barrier-free truck tolling for Spain's Basque region
    October 11, 2024
    MLFF system covers 146 lanes and has been processing 1.4 million transactions daily
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • Brooklyn eyes Bogota’s BRT system
    June 17, 2016
    David Crawford considers the increased interest in bus rapid transit and looks that the latest trends. Bus rapid transit (BRT) is gaining an increasingly high profile in the US public transport agenda, for two main reasons. One is the potential for ‘trains on wheels’ to save substantially on installation costs as compared with other modes such as underground metros or light-rail transit. Another, highlighted in the case of New York City, is the value of having a rapid surface-based alternative available whe