Skip to main content

Parsons Brinckerhoff to modernise Michigan freeway

Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
July 4, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff has been awarded a contract to assist the 1688 Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan.

The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improving the drainage system, enhanced aesthetic treatments developed through intensive stakeholder engagement, and upgrading geometrics and interchanges. One new lane will be added in each direction to serve as an HOV lane during peak periods.

As the owner’s representative, Parsons Brinckerhoff will serve as an extension of the Michigan DOT staff, responsible for multi-year work order tasks to support the DOT in the delivery of both design-build and design-bid-build segments.

The I-75 modernisation corridor is divided into eight segments with the first to be delivered under a design-build contract and the remaining seven segments delivered through design-bid-build. Completion of the overall project is slated for 2032.

Related Content

  • May 3, 2012
    Cost saving multi-agency transportation and emergency management
    Although the recession had dramatically reduced traffic volumes in the past few years, the economy was on the brink of a recovery that portended well for jobs but poorly for traffic congestion. Leaders of four government agencies in Houston, Texas, got together to discuss how to collectively cope with the expected increase in vehicles on the road. "They knew they couldn't pour enough concrete to solve the problem, and they also knew the old model of working in a vacuum as standalone entities would fail," sa
  • February 22, 2017
    Parsons Selected for I-95/LPGA Boulevard Interchange Improvement in Florida
    Parsons has been selected by the Florida Department of Transportation, District 5, to carry out an interchange analysis for the conceptual layout and ultimate reconfiguration of the I-95 interchange with LPGA Boulevard in Volusia County, Florida. Upon completion of the analysis and selection of the interchange configuration, Parsons will also perform final design services. The interchange is a crucial access point during morning and evening rush-hour traffic in the area, where traffic and congestion are
  • August 5, 2024
    Iteris wins $3.75m traffic info contract for Bay Area
    Firm will provide San Francisco MTC’s 511 Traveler Information telephone system
  • June 14, 2018
    Parsons to upgrade services in Orange County
    Parsons will implement its tolling technology along a key toll road in California. It will work on the Orange County segment of the four-lane, 18-mile 91 Express Lanes to improve services along the corridor. The company was chosen by the Orange County Transportation Authority (OCTA) to deliver technical and operational services, including specifications development for toll and ITS, tolling-related planning and construction activities.