Skip to main content

Parsons Brinckerhoff to modernise Michigan freeway

Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
July 4, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff has been awarded a contract to assist the 1688 Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan.

The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improving the drainage system, enhanced aesthetic treatments developed through intensive stakeholder engagement, and upgrading geometrics and interchanges. One new lane will be added in each direction to serve as an HOV lane during peak periods.

As the owner’s representative, Parsons Brinckerhoff will serve as an extension of the Michigan DOT staff, responsible for multi-year work order tasks to support the DOT in the delivery of both design-build and design-bid-build segments.

The I-75 modernisation corridor is divided into eight segments with the first to be delivered under a design-build contract and the remaining seven segments delivered through design-bid-build. Completion of the overall project is slated for 2032.

Related Content

  • May 1, 2025
    Three for Q-Free in the US
    Kinetic Mobility will be used in Denver, Washington DC and Dallas-Fort Worth
  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • April 12, 2013
    Active traffic management - challenges and benefits
    Minnesota DoT has built one of the most intensive Active Traffic Management (ATM) systems on the road today. Like many ITS deployments, the state has gained benefits but also faces many challenges, as Pete Goldin reports. Smart Lanes is the brand name of Minnesota Department of Transportation’s (MnDoT) ATM system on I-35W in the Twin Cities Metro Area. The original system covered 16 miles of I-35W south of Minneapolis starting in 2009, and was extended by two miles in 2011. Additional ATM equipment was inst
  • February 1, 2012
    No in-road equipment for Queensland's free flow toll bridge
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.