Skip to main content

Parsons Brinckerhoff to modernise Michigan freeway

Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
July 4, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff has been awarded a contract to assist the 1688 Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan.

The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improving the drainage system, enhanced aesthetic treatments developed through intensive stakeholder engagement, and upgrading geometrics and interchanges. One new lane will be added in each direction to serve as an HOV lane during peak periods.

As the owner’s representative, Parsons Brinckerhoff will serve as an extension of the Michigan DOT staff, responsible for multi-year work order tasks to support the DOT in the delivery of both design-build and design-bid-build segments.

The I-75 modernisation corridor is divided into eight segments with the first to be delivered under a design-build contract and the remaining seven segments delivered through design-bid-build. Completion of the overall project is slated for 2032.

Related Content

  • October 31, 2014
    Parsons Brinckerhoff wins consultancy services contract
    Engineering consultant Parsons Brinckerhoff has secured a nine-year contract with Somerset County Council in the UK to provide engineering consultancy services. Anticipated activity under the framework contract will cover a diverse range of services, including: transportation studies; design of transport improvement and maintenance schemes; environmental planning and consultancy; highways safety studies; structures inspections; and construction management. The contract has been drafted to enable othe
  • February 11, 2014
    Parsons Brinckerhoff JV to design Queensland motorway project
    Parsons Brinckerhoff and joint venture partner Seymour Whyte has been awarded the design and construct contract for the Smith Street Motorway and Olsen Avenue Interchange upgrade in Queensland. The project, worth in excess of US$50m, was awarded by the Department of Transport and Main Roads and involves the upgrade of the critical link between the new Gold Coast Health and Knowledge Precinct and the Pacific Motorway. Project focus areas include: Providing capacity for future traffic volumes and emergenc
  • November 15, 2016
    WSP/Parsons Brinckerhoff designing new bridge in Florida
    WSP /Parsons Brinckerhoff will design a new bridge in Pensacola, Florida as part of a design-build team led by Skanska. The project is being undertaken on behalf of the Florida Department of Transportation. The US$398.5 million project includes design and construction of new westbound and eastbound bridges on Route 30 (US 98) to replace the existing three-mile-long bridge that links the communities of Pensacola and Gulf Breeze. The project also includes shared-use paths on the outside of each bridge, rec
  • February 14, 2014
    Parsons Brinckerhoff to provide quality control for Cleveland bridge
    Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de