Skip to main content

Parsons Brinckerhoff to modernise Michigan freeway

Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
July 4, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff has been awarded a contract to assist the 1688 Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan.

The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improving the drainage system, enhanced aesthetic treatments developed through intensive stakeholder engagement, and upgrading geometrics and interchanges. One new lane will be added in each direction to serve as an HOV lane during peak periods.

As the owner’s representative, Parsons Brinckerhoff will serve as an extension of the Michigan DOT staff, responsible for multi-year work order tasks to support the DOT in the delivery of both design-build and design-bid-build segments.

The I-75 modernisation corridor is divided into eight segments with the first to be delivered under a design-build contract and the remaining seven segments delivered through design-bid-build. Completion of the overall project is slated for 2032.

Related Content

  • March 16, 2015
    Report analyses multiple ITS projects to highlight cost and benefits
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • June 30, 2014
    Ferrovial consortium to build I-77 HOT lanes
    Cintra, a US subsidiary of Spanish infrastructure firm Ferrovial, is to be responsible for the development of the I-77 HOT Lanes Project led by the North Carolina Department of Transportation (NCDOT). The US$655 million project, extending 26 miles from the I-77 connection with I-277 in Charlotte to the intersection with NC 150 in Iredell County, will enhance traffic connectivity between residential areas along the corridor and downtown Charlotte. The project includes the development of high occupancy tol
  • January 25, 2022
    Data helps Ohio DoT get grant money
    Ohio Department of Transportation turned to StreetLight Data when it needed to finalise grant money for a key infrastructure link. David Crawford sees how metrics brought in the cash…
  • May 11, 2012
    Funding shortfall for US Interstate upgrades
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str