Skip to main content

Parsons Brinckerhoff to modernise Michigan freeway

Parsons Brinckerhoff has been awarded a contract to assist the Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan. The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improvin
July 4, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff has been awarded a contract to assist the 1688 Michigan Department of Transportation (DOT) with the delivery of a project to modernise an 18-mile section of the I-75 freeway in Oakland County, Michigan.

The US$850 million project, which runs from Auburn Hills to Hazel Park, involves reconstruction of the highway along with the addition of the first high-occupancy vehicle (HOV) lanes in Michigan. The project includes replacement of 51 bridges, reconstructing existing road surface, improving the drainage system, enhanced aesthetic treatments developed through intensive stakeholder engagement, and upgrading geometrics and interchanges. One new lane will be added in each direction to serve as an HOV lane during peak periods.

As the owner’s representative, Parsons Brinckerhoff will serve as an extension of the Michigan DOT staff, responsible for multi-year work order tasks to support the DOT in the delivery of both design-build and design-bid-build segments.

The I-75 modernisation corridor is divided into eight segments with the first to be delivered under a design-build contract and the remaining seven segments delivered through design-bid-build. Completion of the overall project is slated for 2032.

For more information on companies in this article

Related Content

  • Thales to upgrade Greater Cairo Metro
    December 18, 2015
    More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
  • Dynamic Message Signs : Don’t replace, refurbish and upgrade
    August 12, 2015
    Refurbishing old dynamic message signs can save money and increase technical capabilities as David Crawford discovers. Evidence is growing on both sides of the Atlantic of the scope for retrofitting old or technically out-of-date dynamic message signs (DMS) with new electronic equipment, to save on the costs of installing full-scale replacements. In the last four months of 2014, a number of US states progressed programmes that achieved savings of more than US$1.75 million (€1.56million).
  • EBRD funds new transport master planning standards for Romania
    August 5, 2014
    In July 2014, the European Bank for Reconstruction and Development (EBRD) awarded funds of around US$1.8 million for the development of sustainable mobility master plans in Romania. The EBRD is the largest institutional investor in Romania. To date, the Bank has invested US$8.9 billion across 364 projects in diverse sectors including industry, commerce, agribusiness, infrastructure, energy and finance.
  • England's National Highways extends Telent contract
    March 24, 2025
    Firm manages digital connectivity services on strategic road network