Skip to main content

Parsons Brinckerhoff JV to design Queensland motorway project

Parsons Brinckerhoff and joint venture partner Seymour Whyte has been awarded the design and construct contract for the Smith Street Motorway and Olsen Avenue Interchange upgrade in Queensland. The project, worth in excess of US$50m, was awarded by the Department of Transport and Main Roads and involves the upgrade of the critical link between the new Gold Coast Health and Knowledge Precinct and the Pacific Motorway. Project focus areas include: Providing capacity for future traffic volumes and emergenc
February 11, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff and joint venture partner Seymour Whyte has been awarded the design and construct contract for the Smith Street Motorway and Olsen Avenue Interchange upgrade in Queensland.

The project, worth in excess of US$50m, was awarded by the 7026 Department of Transport and Main Roads and involves the upgrade of the critical link between the new Gold Coast Health and Knowledge Precinct and the Pacific Motorway. Project focus areas include: Providing capacity for future traffic volumes and emergency vehicle movements around the Gold Coast Health and Knowledge Precinct; Allowing for greater traffic efficiency with extra through and turning lanes at the Smith Street Motorway/Olsen Avenue interchange; Facilitating access to the new Gold Coast University Hospital from Olsen Avenue and Smith Street; Alleviating congestion for traffic entering and leaving the Smith Street Motorway; and improving pedestrian access to the university through signalised crossings on Olsen Avenue

Parsons Brinckerhoff’s director of transport, Mark Keogh commented that the structure of this joint venture is unique and represents a positive, strategic step forward for industry: “We are pleased that Parsons Brinckerhoff and Seymour Whyte have joined together under a joint venture agreement to deliver this project, and will be trading as GC Connect Joint Venture.

“A key challenge for the project will be to ensure that all critical milestones are met, with construction set to commence in early 2014 and expected completion in mid-2015,” he concluded.

For more information on companies in this article

Related Content

  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.
  • BrisConnections selects Kapsch TrafficCom
    February 2, 2012
    Kapsch TrafficCom has been awarded a contract by Thiess John Holland, the design and construction contractor for the Brisbane Airport Link and Northern Busway Project, to deliver an Electronic Toll Collection (ETC) system worth over US$12.25 million.
  • Max Lay Award winner announced by ITS Australia
    December 10, 2024
    Organisation's highest honour goes to Western Australia ITS veteran
  • Pricing practise for HOT lane operation
    May 11, 2017
    Timothy Compston weighs up the critical elements that keep the wheels of dynamic pricing schemes turning in today's high-occupancy toll (HOT) lanes. In the drive towards smarter tolling it is perhaps not surprising that sophisticated pricing algorithms are being rolled out to better reflect supply and demand on the roadway. This is the case with high-occupancy toll (HOT) lanes which a growing number of DoTs are seeing as a way of smoothing the operation of their existing, and planned, freeway infrastructure