Skip to main content

Parsons Brinckerhoff JV to design Queensland motorway project

Parsons Brinckerhoff and joint venture partner Seymour Whyte has been awarded the design and construct contract for the Smith Street Motorway and Olsen Avenue Interchange upgrade in Queensland. The project, worth in excess of US$50m, was awarded by the Department of Transport and Main Roads and involves the upgrade of the critical link between the new Gold Coast Health and Knowledge Precinct and the Pacific Motorway. Project focus areas include: Providing capacity for future traffic volumes and emergenc
February 11, 2014 Read time: 2 mins
4983 Parsons Brinckerhoff and joint venture partner Seymour Whyte has been awarded the design and construct contract for the Smith Street Motorway and Olsen Avenue Interchange upgrade in Queensland.

The project, worth in excess of US$50m, was awarded by the 7026 Department of Transport and Main Roads and involves the upgrade of the critical link between the new Gold Coast Health and Knowledge Precinct and the Pacific Motorway. Project focus areas include: Providing capacity for future traffic volumes and emergency vehicle movements around the Gold Coast Health and Knowledge Precinct; Allowing for greater traffic efficiency with extra through and turning lanes at the Smith Street Motorway/Olsen Avenue interchange; Facilitating access to the new Gold Coast University Hospital from Olsen Avenue and Smith Street; Alleviating congestion for traffic entering and leaving the Smith Street Motorway; and improving pedestrian access to the university through signalised crossings on Olsen Avenue

Parsons Brinckerhoff’s director of transport, Mark Keogh commented that the structure of this joint venture is unique and represents a positive, strategic step forward for industry: “We are pleased that Parsons Brinckerhoff and Seymour Whyte have joined together under a joint venture agreement to deliver this project, and will be trading as GC Connect Joint Venture.

“A key challenge for the project will be to ensure that all critical milestones are met, with construction set to commence in early 2014 and expected completion in mid-2015,” he concluded.

For more information on companies in this article

Related Content

  • Iteris analyses Orange County bus operations
    April 25, 2025
    Study area takes in five cities and 53 signalised intersections
  • Transport for the North gears up
    January 13, 2015
    UK Transport Secretary Patrick McLoughlin attended the inaugural Transport for the North meeting as northern leaders met to discuss their plans to transform the region into a northern powerhouse. The meeting in Leeds heralded the first step of drawing up with the government a comprehensive transport strategy to transform the north’s economic infrastructure and help maximise the region’s growth potential, rebalancing the national economy. As well as examining east-west rail links to better connect the
  • Parsons Group president to address Bloomberg Next Summit
    November 11, 2016
    Parsons Group president Michael Johnson is to speak at the Bloomberg Next summit on 14 November at Bloomberg’s office in Washington, DC, where he will discuss the United States’ emerging needs and priorities in infrastructure, the areas of focus for the next Congress and Administration on this issue, and industry’s role in continuing to advance American infrastructure.
  • Developing integrated transport networks
    September 20, 2012
    A major initiative in managing numerous transport networks as a single system has moved into a significant phase with design of sophisticated new ITS systems. Jon Masters reports. Detailed design work is under way on two pilot projects pursuing a common principle – that transportation can be made more efficient or effective if the various networks and modes of travel are managed as a whole system. This is the central tenet of the US Department of Transportation’s (USDOT) Integrated Corridor Management (ICM)