Skip to main content

Parsons Brinckerhoff to evaluate Babylon transportation

Parsons Brinckerhoff has been awarded a contract by the Town of Babylon to conduct an Alternatives Analysis for Route 110 within the towns of Babylon and Huntington in Suffolk County, New York. The purpose of the study is to evaluate transportation demand in the Route 110 corridor, manage congestion, maximise environmental benefits and enhance economic competitiveness.
November 24, 2014 Read time: 2 mins

 4983 Parsons Brinckerhoff has been awarded a contract by the Town of Babylon to conduct an Alternatives Analysis for Route 110 within the towns of Babylon and Huntington in Suffolk County, New York. The purpose of the study is to evaluate transportation demand in the Route 110 corridor, manage congestion, maximise environmental benefits and enhance economic competitiveness.

The analysis will build upon previous studies, including Suffolk County executive Steven Bellone’s Connect Long Island Plan and the Suffolk County Bus Rapid Transit (BRT) Feasibility Study, to select a locally preferred alternative to advance to project development and review by the 2023 Federal Transit Administration (FTA).

The Connect Long Island Plan envisions growing regional employment centres and walk-able mixed-use transit-oriented developments linked by the Long Island Rail Road, as well as high-quality north-south mass transit connections.

The Route 110 corridor is home to corporate headquarters, major technology firms, educational institutions, research facilities, and retail centres and employs approximately 10 per cent of Long Island’s workforce. However, the corridor’s future success is currently at risk as traffic volumes and congestion continue to increase, its sprawling auto-centred development patterns become less attractive to employers and residents and competition from other business centres and corridors in the region continues to grow.  

Parsons Brinckerhoff will provide overall project management for the Alternatives Analysis and will lead the transportation planning and engineering, conceptual design, development of financing strategies, economic analyses, and public outreach components of the project. The firm will also be responsible for quality assurance/quality control activities and coordination with the FTA.

For more information on companies in this article

Related Content

  • $268m FTA grant for San Antonio rapid transit
    January 3, 2025
    Via Rapid Green Line is planned to be up and running by late 2027
  • Parsons Brinckerhoff to provide quality control for Cleveland bridge
    February 14, 2014
    Parsons Brinckerhoff is part of the winning design-build team selected by the Ohio Department of Transportation (ODOT) to provide design and construction for the new George V. Voinovich, I-90 Cleveland Inner belt Eastbound Bridge project. Led by the TGR joint venture, comprising Trumbull Corporation, the Great Lakes Construction Company, and the Ruhlin Company, Parsons Brinckerhoff is serving as the independent quality firm (IQF). The eastbound bridge is part of a phased project that will ultimately de
  • Parsons Brinckerhoff to provide specialist services to Transport for Greater Manchester
    September 6, 2012
    Parsons Brinckerhoff, the international engineering consultant, has been appointed to provide a broad range of specialist services to Transport for Greater Manchester (TfGM) under its new Transport Professional Services framework, a key enabler to help deliver much-needed investment in transport infrastructure across the region.
  • Consortium to build Denver’s north metro rail line
    November 28, 2013
    A consortium including Graham, Stantec, Parsons Brinckerhoff, Balfour Beatty and Hamon Constructors (GBBH) has been awarded a US$343 million contract by Denver’s Regional Transportation District (RTD) to design and build the north metro rail line. The North Metro project, part of RTD’s sprawling FasTracks transit network, is a proposed 18.4 mile electrified commuter rail line that will connect Denver and Adams County by serving Commerce City, Northglenn and Thornton. Construction begins in 2014 and t