Skip to main content

Parsons Brinckerhoff to evaluate Babylon transportation

Parsons Brinckerhoff has been awarded a contract by the Town of Babylon to conduct an Alternatives Analysis for Route 110 within the towns of Babylon and Huntington in Suffolk County, New York. The purpose of the study is to evaluate transportation demand in the Route 110 corridor, manage congestion, maximise environmental benefits and enhance economic competitiveness.
November 24, 2014 Read time: 2 mins

 4983 Parsons Brinckerhoff has been awarded a contract by the Town of Babylon to conduct an Alternatives Analysis for Route 110 within the towns of Babylon and Huntington in Suffolk County, New York. The purpose of the study is to evaluate transportation demand in the Route 110 corridor, manage congestion, maximise environmental benefits and enhance economic competitiveness.

The analysis will build upon previous studies, including Suffolk County executive Steven Bellone’s Connect Long Island Plan and the Suffolk County Bus Rapid Transit (BRT) Feasibility Study, to select a locally preferred alternative to advance to project development and review by the 2023 Federal Transit Administration (FTA).

The Connect Long Island Plan envisions growing regional employment centres and walk-able mixed-use transit-oriented developments linked by the Long Island Rail Road, as well as high-quality north-south mass transit connections.

The Route 110 corridor is home to corporate headquarters, major technology firms, educational institutions, research facilities, and retail centres and employs approximately 10 per cent of Long Island’s workforce. However, the corridor’s future success is currently at risk as traffic volumes and congestion continue to increase, its sprawling auto-centred development patterns become less attractive to employers and residents and competition from other business centres and corridors in the region continues to grow.  

Parsons Brinckerhoff will provide overall project management for the Alternatives Analysis and will lead the transportation planning and engineering, conceptual design, development of financing strategies, economic analyses, and public outreach components of the project. The firm will also be responsible for quality assurance/quality control activities and coordination with the FTA.

For more information on companies in this article

Related Content

  • RBF Consulting selected for ‘hot spots’ feasibility analysis
    April 17, 2012
    RBF Consulting has been selected by the Los Angeles County Metropolitan Transportation Authority to provide transportation planning and engineering for the Measure R funded I-605 Congestion ‘Hot Spots’ Feasibility Analysis. Hot spots are identified as major traffic congestion areas, attributed to increasing passenger car and truck traffic, localised capacity and/or operational constraints on the freeway, or arterial street system.
  • Transition to all electronic tolling leads to cost savings
    February 2, 2012
    How a temporary congestion-relief solution resulted in the North Texas Tollway Authority's transition to all-electronic toll collection and potential savings of up to $472 million by 2045. By Carla Kienast, ETC Corporation
  • Authorities switch on to all electric buses as costs tumble
    January 9, 2018
    Alan Dron looks at changes in bus propulsion as cities look to improve air quality and seek to reduce maintenance costs. Despite the ending of various incentives to adopt alternative fuels, the introduction of electric buses by US transit authorities is picking up speed as performance improves, costs drop and air quality considerations become increasingly significant. More US bus manufacturers are introducing zero-emission models and some recent contracts will see many more passengers getting their first
  • ITS World Congress examines challenges of autonomous vehicles?
    December 11, 2015
    The 2015 ITS World Congress opening ceremony saw PSA Peugeot Citroën executives arrive in an autonomous vehicle, so the International Benefits, Evaluation and Costs (IBEC) Working Group’s dedicated session proved very timely.