Skip to main content

Parsons Brinckerhoff to evaluate Babylon transportation

Parsons Brinckerhoff has been awarded a contract by the Town of Babylon to conduct an Alternatives Analysis for Route 110 within the towns of Babylon and Huntington in Suffolk County, New York. The purpose of the study is to evaluate transportation demand in the Route 110 corridor, manage congestion, maximise environmental benefits and enhance economic competitiveness.
November 24, 2014 Read time: 2 mins

 4983 Parsons Brinckerhoff has been awarded a contract by the Town of Babylon to conduct an Alternatives Analysis for Route 110 within the towns of Babylon and Huntington in Suffolk County, New York. The purpose of the study is to evaluate transportation demand in the Route 110 corridor, manage congestion, maximise environmental benefits and enhance economic competitiveness.

The analysis will build upon previous studies, including Suffolk County executive Steven Bellone’s Connect Long Island Plan and the Suffolk County Bus Rapid Transit (BRT) Feasibility Study, to select a locally preferred alternative to advance to project development and review by the 2023 Federal Transit Administration (FTA).

The Connect Long Island Plan envisions growing regional employment centres and walk-able mixed-use transit-oriented developments linked by the Long Island Rail Road, as well as high-quality north-south mass transit connections.

The Route 110 corridor is home to corporate headquarters, major technology firms, educational institutions, research facilities, and retail centres and employs approximately 10 per cent of Long Island’s workforce. However, the corridor’s future success is currently at risk as traffic volumes and congestion continue to increase, its sprawling auto-centred development patterns become less attractive to employers and residents and competition from other business centres and corridors in the region continues to grow.  

Parsons Brinckerhoff will provide overall project management for the Alternatives Analysis and will lead the transportation planning and engineering, conceptual design, development of financing strategies, economic analyses, and public outreach components of the project. The firm will also be responsible for quality assurance/quality control activities and coordination with the FTA.

For more information on companies in this article

Related Content

  • Adaptive control reduces travel time, cuts congestion
    January 20, 2012
    Situated in San Diego County, California, the growing city of San Marcos has seen its population increase by 53.5 per cent since the turn of the century. Although this dramatic population increase has spurred economic growth bringing new business, homes and opportunities to the city, it has also increased traffic congestion along its central corridor, San Marcos Boulevard. This became the most congested arterial in the city, and, by 2006, the second-most travelled corridor in San Diego County.
  • New transit centre for Rhode Island
    February 1, 2023
    Development will have space for bikes and is expected to serve three million users a year
  • Public transit is weapon in US congestion war
    December 3, 2018
    Public transit is a huge component of US transportation, insists Mary Scott Nabers, CEO of Strategic Partnerships – and infrastructure upgrades have the potential to create thousands of jobs When it comes to public transportation, the US lags far behind other countries. Governments in Europe, Asia and Canada invest heavily in public transportation because it is viewed as an essential public good. The US government, however, views public transit a little differently and funding has been inadequate for d
  • Parsons Brinckerhoff first to receive AEO status
    March 4, 2014
    The Asset Standards Authority (ASA) of Transport for New South Wales (NSW), Australia, has recognised Parsons Brinckerhoff as an Authorised Engineering Organisation (AEO), making the company the first major consultancy firm in NSW to be authorised to undertake engineering works on behalf of Transport for NSW. Parsons Brinckerhoff says the authorisation is a significant achievement; the status requires engineering firms to demonstrate they have processes and procedures in place to assure the design, safet