Skip to main content

Paris metro world first inaugurated today

Pierre Mongin, chairman and CEO of RATP has today inaugurated the commissioning of the first automatic trains on Line 1 of the Paris metro in the presence of Nathalie Kosciusko-Morizet, minister for ecology, sustainable development, transportation and housing and Jean-Paul Huchon, president of the regional council of Île-de-France.
March 23, 2012 Read time: 3 mins
Automatic and manually driven trains are running concurrently on the Paris Metro
Pierre Mongin, chairman and CEO of 4223 RATP has today inaugurated the commissioning of the first automatic trains on Line 1 of the 4224 Paris Metro in the presence of Nathalie Kosciusko-Morizet, minister for ecology, sustainable development, transportation and housing and Jean-Paul Huchon, president of the regional council of Île-de-France.

The commissioning of the first automatic trains on this line, Paris Metro’s oldest and most popular line, with 725,000 passengers per day, is a world first in terms of technology and organisation.
For the first time, a subway line has been automated without any major interruption to services. In addition, until December 2012, when all trains will be automated, RATP is combining both automatic and manually driven trains on the same line.

As RAPT points out, this is a true challenge for its engineers given the importance of the line. Starting this autumn, eight automatic trains will run in tandem with “classic” trains, and the integration will continue at a rate of two new trains per month.
The automation of Line 1 was undertaken in the context of the overall modernisation of the subway, and financed entirely by RATP at a cost of €600 million (US$828 million), which was only an additional four per cent compared to the investment that would have been necessary to replace the Line’s current equipment.

In carrying out this dual challenge of technology and organisation for such an important line, RATP says it has confirmed its real expertise in the design and operation of automated metro systems, strengthening its global leadership in this area.

This technological change has become necessary to deal with the steady increase in passenger traffic. One of the main benefits of automation is the Line’s ability to react instantly to an increase in passengers and provide the number of trains required for optimum operation of the line. The installation of 954 platform screen doors on all the lines’ platforms will contribute significantly to the smooth running of the line, avoiding interruptions associated with track intrusions, while also enhancing passenger safety. Intercoms have been installed to allow contact with a supervisor at the command centre (PCC) at all times. Onboard cameras will allow supervisors to instantly assess live situations and make real-time decisions while remaining in contact with passengers.

Line 1 will also benefit from a newly developed and colourful design: a red floor and multicoloured stripes on the seat covers, new lighting to accentuate the impression of space, and four screens in each car which will provide passengers with continuous information.

Approved by the 4225 Syndicat des Transports Île-de-France (STIF), the Greater Paris region’s transportation union, this project was also supported by staff. Drivers were offered customised professional development, or work on other lines, or the automatic system.

RAPT says the sophisticated technical equipment required for the automated line was developed with industry partners, all leaders in their areas, whether in computerised signalling, automatic trains or civil engineering, and demonstrate its progress in mastering new operating systems for urban transportation.

Related Content

  • November 20, 2014
    RATP Dev and SAPTCO win contract to operate the future Riyadh bus network
    RATP Group subsidiary RATP Dev and Saudi Public Transport Company (SAPTCO) have won a twelve-year US$2.1 billion contract to implement, operate and maintain the future bus network in the Saudi Arabian capital of Riyadh. The network’s 103 lines will gradually enter service after two years of preparation starting from the launch of the contract. The network will be run using a fleet of approximately 1,000 vehicles and will include four BHLS (Buses with High Level of Service) lines, two circular lines, 17
  • February 23, 2021
    Conduent to upgrade Paris on-board ticketing
    10-year deal applies to bus and tram services across the whole Île-de-France region
  • May 2, 2018
    Running on empty
    Drivers are an increasingly rare species on Europe’s commuter metros as unattended train operation is embraced. David Crawford takes a low-speed tour of the continent’s capitals to see what’s happening. Unattended train operation (UTO) is fast becoming the norm for Europe’s metros, on existing as well as new lines. November 2017 statistics published by the International Association of Public Transport (UITP) show the continent as having 28% of the global total of route km on lines operating at the ultimate
  • August 9, 2016
    First trial of 4G LTE technology in a mass transit system
    French public transport operator Régie Autonome des Transports Parisiens (RATP) and Nokia have successfully completed the first trial of 4G LTE technology on a portion of the Paris Metro line 14. According to RATP, the trial demonstrated that a single 4G LTE network can be used for all operational train communications, which are currently supported by different channels – a mixture of wi-fi, digital radio and 3G/4G networks. The test demonstrated that a single LTE mobile network can replace tradition