Skip to main content

Panama's metro line 2 awarded

The concession to build Panama City's metro line No. 2 has been awarded to a consortium comprised of Brazilian company Norberto Odebrecht and Spanish infrastructure giant FCC. The 22 kilometre long elevated line will connect the city's northern and eastern sectors and line No. 1. The consortium, known as Consorcio Línea 2, offered US$1.86 billion for civil works, US$50.7 million for maintenance works, and US$214 million for financing, totalling roughly US$2.2bn, according to Metro de Panama.
May 18, 2015 Read time: 1 min
The concession to build Panama City's metro line No. 2 has been awarded to a consortium comprised of Brazilian company Norberto 4740 Odebrecht and Spanish infrastructure giant 5656 FCC.

The 22 kilometre long elevated line will connect the city's northern and eastern sectors and line No. 1.

The consortium, known as Consorcio Línea 2, offered US$1.86 billion for civil works, US$50.7 million for maintenance works, and US$214 million for financing, totalling roughly US$2.2bn, according to Metro de Panama.

This alliance, in which the Brazilian company owns 60 per cent and the Spanish company 40 per cent, also built Panama City's US$1.7 billion line No. 1, which has been operating for one year and was the first to launch in Central America.

Construction should begin within two months, and the consortium will have 46 months to complete works.

For more information on companies in this article

Related Content

  • USDOT finances Ohio River Bridges East End Crossing
    April 17, 2015
    US Transportation Secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$162 million from the Department's Federal Highway Administration to finance the East End Crossing section of the Louisville-Southern Indiana Ohio River Bridges Project. At the total cost of US$1.27 billion, the East End Crossing includes the East End Bridge and its connecting roadways. The bridge spans the Ohio River eight miles to the north connecting the east end of Louis
  • ‘Getting schooled in infrastructure’ tour kicks off
    June 17, 2014
    The ‘Getting schooled in infrastructure’ campaign bus tour by the US Laborers' International Union of North America (LIUNA) began this week at the now-closed I-495 bridge in Wilmington. The tour, intended to highlight LIUNA’s concerns about the country’s failing roads and bridges, will travel through more than 22 cities and Congressional districts in a bid to press Congress to pass a long-term, full-investment Highway Bill this year. The campaign also includes radio ads, billboards, online activity and g
  • Learning from informal transit networks
    March 30, 2021
    When it comes to public transportation, the Minority World could take lessons in equity from the mobility infrastructure of emerging market cities, says Devin de Vries of WhereIsMyTransport
  • Adaptive control reduces travel time, cuts congestion
    January 20, 2012
    Situated in San Diego County, California, the growing city of San Marcos has seen its population increase by 53.5 per cent since the turn of the century. Although this dramatic population increase has spurred economic growth bringing new business, homes and opportunities to the city, it has also increased traffic congestion along its central corridor, San Marcos Boulevard. This became the most congested arterial in the city, and, by 2006, the second-most travelled corridor in San Diego County.