Skip to main content

Panama's metro line 2 awarded

The concession to build Panama City's metro line No. 2 has been awarded to a consortium comprised of Brazilian company Norberto Odebrecht and Spanish infrastructure giant FCC. The 22 kilometre long elevated line will connect the city's northern and eastern sectors and line No. 1. The consortium, known as Consorcio Línea 2, offered US$1.86 billion for civil works, US$50.7 million for maintenance works, and US$214 million for financing, totalling roughly US$2.2bn, according to Metro de Panama.
May 18, 2015 Read time: 1 min
The concession to build Panama City's metro line No. 2 has been awarded to a consortium comprised of Brazilian company Norberto 4740 Odebrecht and Spanish infrastructure giant 5656 FCC.

The 22 kilometre long elevated line will connect the city's northern and eastern sectors and line No. 1.

The consortium, known as Consorcio Línea 2, offered US$1.86 billion for civil works, US$50.7 million for maintenance works, and US$214 million for financing, totalling roughly US$2.2bn, according to Metro de Panama.

This alliance, in which the Brazilian company owns 60 per cent and the Spanish company 40 per cent, also built Panama City's US$1.7 billion line No. 1, which has been operating for one year and was the first to launch in Central America.

Construction should begin within two months, and the consortium will have 46 months to complete works.

For more information on companies in this article

Related Content

  • GMV contactless payment for Madrid transit
    July 7, 2025
    EMV system used by Madrid Regional Transportation Consortium companies
  • First year of growth in demand for public transport in EU ‘since economic crisis’
    June 21, 2016
    The use of public transport in the European Union has reached its highest level since 2000, with a total of 57.9 billion journeys made in 2014, according to a new study released today by UITP (International Association of Public Transport). 2014 was the first year of distinct growth in demand for public transport after years of stable demand following the start of the economic crisis in 2008. The highest total demand in 2014 for bus, tram, metro and suburban rail was recorded in Germany (10.9 billi
  • Less travel aggravation to blunt Aggieland fans’ motivation
    June 17, 2016
    Returning travel times to normal within two hours of the end of a major football game was the challenge facing College Station, Adam Lyons explains how this was achieved. College Station, TX, also known as ‘Aggieland’, is located right in the middle of the Dallas/Fort Worth, San Antonio and Houston triangle making the city accessible to over 14 million Texans within less than a four-hour drive. One of the biggest draws to this area is Texas A&M University (TAMU) and the Aggie football games in the fall, mea
  • Congestion costs US trucking industry US$9.2 billion in 2013
    May 1, 2014
    Congestion on US Interstate highways added over US $9.2 billion in operational costs to the trucking industry in 2013, according to research released by the American Transportation Research Institute (ATRI). ATRI, the trucking industry’s not-for-profit research institute, utilised motor carrier financial data along with billions of anonymous truck GPS data points to calculate congestion delays and costs on each mile of Interstate roadway. Delay totalled over 141 million hours of lost productivity, which equ