Skip to main content

Oklahoma interstates and highways designated as Alternative Fuel Corridors

The Oklahoma Federal Highway Administration has designated the I-35, I-40 and I-44 highways as alternative fuel corridors, a special designation aimed at improving the mobility of passenger and commercial vehicles that run on alternative fuels. This new designation means special highway signage indicating the nearest alternative fuelling station will eventually be placed along these highways by the Oklahoma Department of Transportation. The federal Fixing America’s Surface Transportation Act directed th
November 22, 2016 Read time: 2 mins
The Oklahoma 831 Federal Highway Administration has designated the I-35, I-40 and I-44 highways as alternative fuel corridors, a special designation aimed at improving the mobility of passenger and commercial vehicles that run on alternative fuels. This new designation means special highway signage indicating the nearest alternative fuelling station will eventually be placed along these highways by the Oklahoma Department of Transportation.

The federal Fixing America’s Surface Transportation Act directed the FHWA to designate national highway corridors for EV charging, hydrogen, propane and CNG fuelling.

The Association of Central Oklahoma Governments and the Indian Nations Council of Governments partnered with ODOT to nominate several Oklahoma highways as alternative fuel corridors. The FHWA approved I-35, I-40 and I-44 as signage ready natural gas fuel corridors and planned electric vehicle (EV) charging corridors, meaning Oklahoma is making strides in development of its EV infrastructure. Oklahoma is the only state with all of its interstate system designated as signage ready for CNG and is now linked to a national network of alternative fuel corridors via highway connections with Texas and Missouri.

Oklahoma was uniquely qualified to designate natural gas corridors due to the wide availability of CNG fuelling along the state’s interstates and highways, and its central position along major highways that cross the nation from coast to coast and from Mexico to Canada. Oklahoma leads the nation in CNG fuelling stations per capita, with at least one natural gas fuelling station on every 100 miles of interstate highway in the state. Most stations can accommodate both passenger and commercial vehicle fuelling.

While Oklahoma’s electric vehicle charging network is less developed, a diverse group of EV stakeholders including convenience stores, electric utilities, auto dealerships, and local governments is working together to identify and construct strategic locations for high-capacity EV chargers that will ensure border-to-border charging within Oklahoma, and connections to neighbouring states.

Related Content

  • August 19, 2015
    Tolling is still stuck on the sidelines says ASECAP speaker
    Geoff Hadwick attended ASECAP’s 2015 Study Days meeting in Lisbon and found a frustrated European tolling sector undertaking some soul searching. The international road tolling industry its failing to make it case and the sector is losing out to a range of other socio-political lobby groups according to International Bridge, Tunnel and Turnpike Association (IBTTA) chief executive Pat Jones. Speaking at the recent 2015 ASECAP Study Days conference in Lisbon, Jones issued a stark warning: “Tolling is still o
  • November 8, 2017
    ABB installs 15 fast chargers for electric vehicles, Iceland
    ON Power, a part of Reykjavik Energy, has signed a contract with ABB for the delivery and installation of 15 Terra multi-standard DC chargers type 53 CJG at various points along Iceland’s main highway. It is part of a plan to expand an e-mobility strategy by increasing the availability of charging stations along central locations of the country’s national highway. The fast chargers can charge an electric vehicle (EV) between 15-30 minutes. It features touch screen displays and graphic visualization
  • December 7, 2015
    ITS America applauds passing of FAST Act
    The US House of Representatives has approved the Fixing America’s Surface Transportation (FAST) Act, five-year legislation to improve America’s roads, bridges, public transit, and rail transportation systems and reform federal surface transportation programs. Among the FAST Act provisions are: US$100 million per year for intelligent transportation systems (ITS) research; Creation of a new US$60 million per year Advanced Transportation and Congestion Management Technologies Deployment Program designed to
  • April 26, 2018
    Canadian government invests in electric bus infrastructure
    The government of Canada will invest CAN1.2m into the South Coast British Columbia Transportation Authority’s (TransLink’s) demonstration project to install overhead charging stations for electric buses in Vancouver. The fund follows a commitment to support initiatives that provide citizens with more options for clean driving. Bus manufacturers New Flyer Industries and Nova Bus will develop the electric transit buses while ABB and Siemens will develop the chargers. These companies will also evaluate the