Skip to main content

Ohio kicks off US$2.5 billion highway construction season

The Ohio government recently outlined the scope of the 2014 highway construction projects to be financed with funds borrowed against future Ohio Turnpike tolls. In total, 936 projects are planned at an estimated cost of US$2.5 billion. Planned projects include the widening of a section of I-75, a three-year project expected to cost about US$260 million, plus a US$28 million reconstruction of part of I-75, US$31 million in improvements to I-475/US 23 in Toledo's western suburbs, and the US$18 million McCo
April 11, 2014 Read time: 2 mins
The Ohio government recently outlined the scope of the 2014 highway construction projects to be financed with funds borrowed against future Ohio Turnpike tolls. In total, 936 projects are planned at an estimated cost of US$2.5 billion.

Planned projects include the widening of a section of I-75, a three-year project expected to cost about US$260 million, plus a US$28 million reconstruction of part of I-75, US$31 million in improvements to I-475/US 23 in Toledo's western suburbs, and the US$18 million McCord Road underpass in Holland.

Legislation approved last year permits revenue derived from the tolls to be spent not just on the turnpike, but on other roads deemed to have a connection to the toll road. The use of toll revenue, in turn, allows the 7609 Ohio Department of Transportation's traditional fuel tax revenue stream to be devoted to other road improvements, principally roads farther from the turnpike, but also including the state's contribution to work like the McCord project, which will replace a busy railroad crossing with a railroad bridge over the road.

For more information on companies in this article

Related Content

  • Slow development of Europe's road user charging
    April 24, 2013
    Delegates convened in Brussels for Europe’s 10th annual Road User Charging Conference in March, when both positive and negative developments came to light for advocates of more widespread introduction of RUC. Jon Masters reports. Goings on across Europe in recent months have again demonstrated how very sensitive road user charging (RUC) is politically. At the 10th annual Road User Charging Conference in Brussels at the beginning of March, a Danish delegation was notable for its absence, but Belgian governme
  • Fluor: here's how to fix US infrastructure
    June 14, 2018
    US president Donald Trump’s comments about the country’s ‘crumbling infrastructure’ led many in the ITS sector to spot an opportunity to help with other solutions. David Seaton of Fluor ponders the scale of what’s required and considers some projects which have boosted mobility We can no longer wait for future generations to address this nation’s crumbling infrastructure. We need to act now. The problem is substantial, to say the least. The American Society of Civil Engineers predicts that failing to clo
  • ACE report: private sector and user-pay for English roads
    May 16, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report - and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas. Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently-published report Funding Roads for the Future. The 25-page document by the London-based Association for Consultancy and Engineering (ACE) calls for a radical rethink about how to
  • Michael Baker to provide construction services for Pennsylvania road upgrade project
    December 21, 2016
    In cooperation with the Pennsylvania Department of Transportation (PennDOT), Michael Baker International is to provide construction services for the improvement of Freedom Road, a major roadway that connects the northern suburbs of Pittsburgh, Interstate 79 and the Pennsylvania Turnpike to State Route 65 (SR 65). PennDOT recently awarded the company a US$4.9 million contract to provide construction management and inspection services for phases one and two of the multi-year project. As part of the c