Skip to main content

Obama administration begins work on 30-year transportation plan

The Obama administration has begun to map out a 30-year framework to meet US infrastructure needs, according to Transportation Secretary Anthony Foxx, speaking in an interview with the Washington Post. Foxx promised a comprehensive review of the demand for new or replacement systems a year ago in an address to the Transportation Research Board. He returned to the group this week to roll out conclusions expected in a report later this year. “Transportation is a system of systems,” Foxx said, rather tha
January 14, 2015 Read time: 2 mins
The Obama administration has begun to map out a 30-year framework to meet US infrastructure needs, according to Transportation Secretary Anthony Foxx, speaking in an interview with the Washington Post.

Foxx promised a comprehensive review of the demand for new or replacement systems a year ago in an address to the 856 Transportation Research Board. He returned to the group this week to roll out conclusions expected in a report later this year.

“Transportation is a system of systems,” Foxx said, rather than the aggregate of separate systems that can be addressed individually. “The idea that we’re looking at the system comprehensively is the thrust of this report.”

He said the report, which will be followed by a formal comment period, is intended as the beginning of a conversation about the future, rather than the conclusive definition of a path forward.

The report being drafted by the Transportation Department draws in part on data compiled in recent years by such groups as the Miller Center at the 2005 University of Virginia and the 5515 American Society of Civil Engineers.

An ASCE report two years ago concluded that it would take a US$3.6 trillion investment by 2020 to meet infrastructure needs, about US$1.6 trillion short of current spending. The Miller Center said maintaining infrastructure at current levels required additional spending of US$134 billion to US$194 billion each year through 2035.

Related Content

  • HDR predicts an adaptable and flexible future for roadways
    December 19, 2016
    HDR consultants, Brian Swindell and Bernie Arseanea, consider managed lanes’ untapped potential. It is no surprise that corridor planning continues to challenge agencies and owners as demand continues to surpass roadway capacity.
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • Kapsch looks to the future
    December 16, 2014
    Colin Sowman reports from a two-day meeting where industry leaders, academics and political advisers presented their thoughts on the future of mobility. Most governments do not dare to introduce tolling systems… they are too frightened.” So said Georg Kapsch in his capacity of chief operating officer of Kapsch TrafficCom, during a forward-looking press event at the company’s headquarters in Vienna.
  • UK plans to penalise rush hour road works
    April 18, 2012
    Innovative measures to cut the number of rush hour road works have been announced by UK Transport Secretary Philip Hammond. Under ‘lane rental’ schemes, councils would be able to charge utility companies to dig up the busiest roads during peak times when road works cause the most disruption. Companies would be able to avoid the charges by carrying out works during quieter periods or, if appropriate, at night.