Skip to main content

Northwest Transit Systems Partners JV to oversee Sound Transit light rail expansion

Northwest Transit Systems Partners (NTSP), a joint venture consisting of US transportation design and construction management firm STV, and Mott MacDonald, is to oversee the systems construction of two new light rail extensions for Sound Transit’s light rail system in Seattle, US. The NTSP team will perform systems construction management services for the US$3.7 billion East Link Extension, a 14-mile-long extension connecting Seattle, Mercer Island, Bellevue and Redmond; and the US$1.9 billion 4.3-mile
August 23, 2017 Read time: 2 mins
Northwest Transit Systems Partners (NTSP), a joint venture consisting of US transportation design and construction management firm STV, and 1869 Mott MacDonald, is to oversee the systems construction of two new light rail extensions for Sound Transit’s light rail system in Seattle, US.


The NTSP team will perform systems construction management services for the US$3.7 billion East Link Extension, a 14-mile-long extension connecting Seattle, Mercer Island, Bellevue and Redmond; and the US$1.9 billion 4.3-mile Northgate Link Extension between the University of Washington at Husky Stadium, the University District and the Northgate area. Both extensions are key components of a larger system expansion being undertaken by Sound Transit over the next 25 years.

Sound Transit estimates that at least 50,000 people a day will use East Link by 2030. Once completed, the extension will be the world’s only passenger light rail service operating over a floating bridge, the section of I-90 over Lake Washington connecting Mercer Island and Seattle.

For more information on companies in this article

Related Content

  • Mayor sets out bold vision for 13 new river crossings for London
    December 4, 2015
    A bold vision to transform cross-river travel in London has been unveiled by the Mayor of London. A total of 13 new tunnels and bridges have been proposed as part of the Mayor’s vision for the future of the Capital, increasing the total number of river crossings between Imperial Wharf and Dartford by more than a third, and the number for pedestrian and cyclists by nearly 50 per cent. The proposals, which would cater for both public transport and road users, are detailed in a new strategic plan that
  • San Diego rail line gets positive train control
    July 24, 2013
    Rail Technology supplier Wabtec is to supply Herzog Technologies to provide with positive train control (PTC) equipment and services for Oceanside, California’s North County Transit District (NCTD) in a deal worth US$9 million. The contract includes an option worth an additional US$5 million. Under the initial contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for seven locomotives and ten passenger transit cab cars on NCTD's Coaster train,
  • Rapid growth makes Texas an incubator for tolling innovation
    September 8, 2014
    As the IBTTA’s annual meeting and exhibition heads for Austin, Mitchell Beer, president of Smarter Shift, considers the role of Texas in the development of tolling strategies and technology. The State of Texas has always prided itself on being ‘larger than life’. From the sprawling geography of the state itself with its wide open skies, to its entrepreneurial ‘get-it-done’ attitude, Texas exudes an impatient restlessness that pushes businesses and public agencies to deliver faster, better results. More ofte
  • Consortium named for Pennsylvania PPP bridge project
    January 27, 2015
    A consortium comprising HDR, Plenary Group, Walsh Group and Granite Construction Company has been awarded the contract to replace 558 bridges as part of the Pennsylvania Rapid Bridge Replacement Project in the US. As lead design engineer for the construction joint venture, HDR will be responsible for bridge and roadway design services, environmental permits, right-of-way plan development and construction phase services. The team will begin construction in summer 2015 and complete all bridge replaceme